The Calnev Pipeline | 54 | |
Description | 54 | |
Check Valves | 55 | |
Block Valves | 56 | |
Dispatch Center | 56 | |
Emergency Response Manual | 57 | |
Personnel Information | 58 | |
Operating Crew of Extra 7551 East | 58 | |
Other Southern Pacific Personnel | 60 | |
Calnev Pipeline Dispatcher | 61 | |
Southern Pacific Training Programs | 61 | |
Engineer Training Program | 61 | |
Dispatcher Training Program | 63 | |
Clerk Training Program | 64 | |
Calnev Pipeline Dispatcher Training Program | 64 | |
Southern Pacific Management Oversight of Train Operations | 65 | |
Industry Pipeline Standards and Federal Regulations | 66 | |
Oversight of Calnev Pipeline Operations | 67 | |
Meteorological Information | 69 | |
Medical and Pathological Information | 69 | |
Train Derailment | 69 | |
Pipeline Rupture | 70 | |
Toxicological Information | 70 | |
Southern Pacific’s Physical Examination Policy | 71 | |
Tests and Research | 71 | |
Event Recorders | 71 | |
Train Dynamics Analyzer Runs | 72 | |
Instrumented Brake Shoe Tests | 73 | |
Train Vibration Study | 73 | |
Soil Inspection Report | 73 | |
Metallurgical Testing | 75 | |
Simulation of Excavating Equipment Operations | 79 | |
Other Information | 80 | |
Train Movements Following the Train Derailment and Preceding the Pipeline Rupture | 80 | |
Agreement Between the Southern Pacific and the City of San Bernardina Following the Train Derailment | 80 | |
Development of Land Adjacent to the Southern Pacific Railroad and the Calnev Pipeline | 81 | |
Disaster Preparedness | 82 | |
Train Derailments over Pipelines | 82 | |
ANALYSIS | ||
General | 85 | |
The Train Derailment | 85 | |
Axles of Dynamic Brakes | 86 | |
Trailing Tonnage | 87 | |
Operation of Extra 7551 East Down the 2.2 Percent Grade | 90 | |
Derailment Speed | 92 | |
Communication | 92 | |
Testing Dynamic Brakes | 94 |
iv