Page:United States Statutes at Large Volume 101 Part 1.djvu/67

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

PUBLIC LAW 100-4—FEB. 4, 1987 (B) to affect the procedures and standards applicable to the Administrator in issuing permits under section 402(a)(1)(B) of the Federal Water Pollution Control Act, and (C) to affect the authority of any State to deny or condition certification under section 401 of such Act with respect to the issuance of permits under section 402(a)(1)(B) of such Act. SEC. 307. COAL REMINING OPERATIONS. Section 301 is amended by adding at the end thereof the following: "(p) MODIFIED PERMIT FOR COAL REMINING OPERATIONS.—

"(1) IN GENERAL.—Subject to paragraphs (2) through (4) of this subsection, the Administrator, or the State in any case which the State has an approved permit program under section 402(b), may issue a permit under section 402 which modifies the requirements of subsection (b)(2)(A) of this section with respect to the pH level of any pre-existing discharge, and with respect to pre-existing discharges of iron and manganese from the remined area of any coal remining operation or with respect to the pH level or level of iron or manganese in any pre-existing discharge affected by the remining operation. Such modified requirements shall apply the best available technology economically achievable on a case-by-case basis, using best professional judgment, to set specific numerical effluent limitations in each permit. "(2) LIMITATIONS.—The Administrator or the State may only issue a permit pursuant to paragraph (1) if the applicant demonstrates to the satisfaction of the Administrator or the State, as the case may be, that the coal remining operation will result in the potential for improved water quality from the remining operation but in no event shall such a permit allow the pH level of any discharge, and in no event shall such a permit allow the discharges of iron and manganese, to exceed the levels being discharged from the remined area before the coal remining operation begins. No discharge from, or affected by, the remining operation shall exceed State water quality standards established under section 303 of this Act. "(3) DEFINITIONS.—For purposes of this subsection— "(A) COAL REMINING OPERATION.—The term 'coal remining operation' means a coal mining operation which begins after the date of the enactment of this subsection at a site on which coal mining was conducted before the effective date of the Surface Mining Control and Reclamation Act of 1977. "(B) REMINED AREA.—The term 'remined area' means only that area of any coal remining operation on which coal mining was conducted before the effective date of the Surface Mining Control and Reclamation Act of 1977. "(C) PRE-EXISTING DISCHARGE.—The term 'pre-existing discharge' means any discharge at the time of permit application under this subsection. "(4) APPLICABILITY OF STRIP MINING LAWS.—Nothing in this subsection shall affect the application of the Surface Mining Control and Reclamation Act of 1977 to any coal remining operation, including the application of such Act to suspended solids.".

101 STAT. 37

33 USC 1342. 33 USC 1341.

33 USC 1311. Ante, p. 35.

State and local governments, 33 USC 1342.

• state and local governments,

33 USC 1313. m

30 USC 1201,c note. ,^