Page:United States Statutes at Large Volume 104 Part 4.djvu/326

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

104 STAT. 2642 PUBLIC LAW 101-549—NOV. 15, 1990 Public information. 42 USC 7661c. violation of this Act, unless the delay in final action was due to the failure of the applicant timely to submit information required or requested to process the application. No source required to have a permit under this title shall be in violation of section 502(a) before the date on which the source is required to submit an application under subsection (c). "(e) COPIES; AVAILABILITY. —A copy of each permit application, compliance plan (including the schedule of compliance), emissions or compliance monitoring report, certification, and each permit issued under this title, shall be available to the public. If an applicant or permittee is required to submit information entitled to protection from disclosure under section 114(c) of this Act, the applicant or permittee may submit such information separately. The requirements of section 114(c) shall apply to such information. The contents of a permit shall not be entitled to protection under section 114(c). "SEC. 504. PERMIT REQUIREMENTS AND CONDITIONS. "(a) CONDITIONS.—Each permit issued under this title shall include enforceable emission limitations and standards, a schedule of compliance, a requirement that the permittee submit to the permitting authority, no less often than every 6 months, the results of any required monitoring, and such other conditions as are necessary to assure compliance with applicable requirements of this Act, including the requirements of the applicable implementation plan. "(b) MONITORING AND ANALYSIS. —The Administrator may by rule prescribe procedures and methods for determining compliance and for monitoring and analysis of pollutants regulated under this Act, but continuous emissions monitoring need not be required if alternative methods are available that provide sufficiently reliable and timely information for determining compliance. Nothing in this subsection shall be construed to affect any continuous emissions monitoring requirement of title IV, or where required elsewhere in this Act. " (c) INSPECTION, ENTRY, MONITORING, CERTIFICATION, AND REPORT- ING. — Each permit issued under this title shall set forth inspection, entry, monitoring, compliance certification, and reporting requirements to assure compliance with the permit terms and conditions. Such monitoring and reporting requirements shall conform to any applicable regulation under subsection (b). Any report required to be submitted by a permit issued to a corporation under this title shall be signed by a responsible corporate official, who shall certify its accuracy. "(d) GENERAL PERMITS. —The permitting authority may, after notice and opportunity for public hearing, issue a general permit covering numerous similar sources. Any general permit shall comply with all requirements applicable to permits under this title. No source covered by a general permit shall thereby be relieved from the obligation to file an application under section 503. "(e) TEMPORARY SOURCES.—The permitting authority may issue a single permit authorizing emissions from similar operations at multiple temporary locations. No such permit shall be issued unless it includes conditions that will assure compliance with all the requirements of this Act at all authorized locations, including, but not limited to, ambient standards and compliance with any applicable increment or visibility requirements under part C of title I. Any such permit shall in addition require the owner or operator to notify