Page:United States Statutes at Large Volume 104 Part 6.djvu/237

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

PUBLIC LAW 101-640—NOV. 28, 1990 104 STAT. 4627 (1) STUDY.—The Comptroller General shall conduct a study of the facts and circumstances concerning the claims of the Highfield Water Company, New Jersey, against the United States Army Corps of Engineers for the purpose of making recommendations for an appropriate settlement of such claims. (2) REPORT.— Not later than 6 months after the date of the enactment of this Act, the Comptroller General shall transmit to Congress a report on the results of the study conducted under this subsection. (u) MANASQUAN RIVER, NEW JERSEY.— (1) STUDY.— The Secretary shall conduct a study of the feasibility of implementing flood control measures on the Manasquan River to alleviate flooding in Freehold, Howell, and other affected townships in New Jersey. (2) REPORT.—Not later than December 31, 1992, the Secretary shall transmit to Congress a report on the results of the study conducted under this subsection. (v) AcEQUiAS IRRIGATION SYSTEM, NEW MEXICO.—The Secretary is authorized to conduct a study of the Acequias irrigation system, New Mexico, to determine whether the project for restoration and preservation of such system, authorized by section 1113 of the Water Resources Development Act of 1986 (100 Stat. 4232), should be expanded to include additional areas of the system. (w) BUFFALO, NEW YORK. — (1) REVIEW AND EVALUATION. — The Secretary shall conduct a review and evaluation of the plan prepared by the city of Buffalo, New York, on flooding and associated water quality problems (including those associated with combined sewer overflows, sewer backups, and riverside outfalls) in the Buffalo, New York, metropolitan area. (2) PURPOSES. —The purposes of the review and evaluation to be conducted under this subsection are to develop recommendations for Federal and non-Federal participation in solving the problems described in paragraph (1) and to identify flood control benefits of implementing the plan. (3) REPORT. —Not later than 9 months after the date of the enactment of this Act, the Secretary shall transmit to Congress and the mayor of Buffalo, New York, a report on the results of the review and evaluation conducted under this subsection. (x) CAESAR'S CREEK LAKE, OHIO.— (1) STUDY.— The Secretary shall conduct a study of the water supply needs of Clinton County, Ohio. (2) REPORT.—Not later than 1 year after the date of the enactment of this Act, the Secretary shall transmit to Congress a report on the results of the study conducted under this subsection, together with recommendations for meeting the projected water supply needs of Clinton County, Ohio. (y) LIBERTY, OHIO. — (1) STUDY.—The Secretary shall conduct a study of the water supply needs of Liberty, Ohio. (2) REPORT.—Not later than 1 year after the date of the enactment of this Act, the Secretary shall transmit to Congress a report on the results of the study conducted under this subsection, together with recommendations for meeting the projected water supply needs of Liberty, Ohio. (z) WASHINGTONVILLE, OHIO.—