Page:United States Statutes at Large Volume 106 Part 6.djvu/247

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

PUBLIC LAW 102-580—OCT. 31, 1992 106 STAT. 4805 total cost of $6,800,000, with an estimated Federal cost of $4,800,000 and an estimated non-Federal cost of $2,000,000. (c) OcEANSiDE HARBOR, CAUFORNIA. —The project for navigation, Oceanside Harbor, California, authorized by the River and Harbor Act of 1965 (79 Stat. 1092), is modified to authorize the Secretary to repair, operate, and maintain the extension of the south jetty constructed in 1968. (d) SAN LEANDRO MARINA, CALIFORNIA. — (1) MAINTENANCE OF SOUTHERN CHANNEL.— The project for navigation, San Leandro Marina, Jack D. Maltester Channel, California, authorized under section 201 of the Flood Control Act of 1965 by resolutions adopted by the Committee on Public Works and Transportation of the House of Representatives on June 22, 1971, and adopted by the Committee on Environment and Public Works of the Senate on December 15, 1970, is modified to direct the Secretary to maintain the 8-foot deep and 100-foot wide access channel extending from the southern auxiliary access channel to the boat launching ramp in the small boat lagoon. (2) DEAUTHORIZATION OF NORTHERN CHANNEL. —The northem auxiliary access channel of the project referred to in paragraph (1) is not authorized after the date of the enactment of this Act. (3) NAMING OF SOUTHERN CHANNEL.— (A) DESIGNATION.— The southern auxiliary channel referred to in paragraph (1) shall be known and designated as the "Jack D. Maltester Channel". (B) LEGAL REFERENCES. — A reference in any law, regulation, document, record, map, or other paper of the United States to the channel referred to in subparagraph (A) shall be deemed to be a reference to the "Jack D. Maltester Channel". (e) CROSS FLORIDA BARGE CANAL. —Section 1114 of the Water Resources Development Act of 1986 (16 U.S.C. 460tt) is amended— (1) by redesignating subsection (f) as subsection (g); and (2) by inserting after subsection (e) the following new subsection: "(f) CONTRACT FOR CONTINUED O&M. — Florida. "(1) IN GENERAL. —During the period beginning on November 28, 1992, and ending on September 30, 1993, the Secretary is authorized and directed to offer to enter into a contract with the St. Johns River Water Management District and the Southwest Florida Water Management District of the State of Florida for the continued operation and maintenance by the Secretary of the portions of the project described in subsection (d). The maintenance shall be performed at a level of service that is necessary to ensure safe operating conditions and to prevent deterioration of the structures. No major rehabilitations or renovations shall be performed by the Secretary in such portions of the project during such period. " (2) FUNDING.—Funding for the continued operation and maintenance of the barge canal project by the Secretary under this subsection shall not exceed $300,000. The State of Florida shall pay a non-Federal share of $600,000 to fund the continued maintenance of the portions of the project described in subsection (d) in accordance with paragraph (1).".