Page:United States Statutes at Large Volume 110 Part 5.djvu/594

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

110 STAT. 3668 PUBLIC LAW 104-303—OCT. 12, 1996 (13) ABSECON ISLAND, NEW JERSEY. — The project for storm damage reduction and shoreline protection, Brigantine Inlet to Great Egg Harbor Inlet, Absecon Island, New Jersey, at a total cost of $52,000,000, with an estimated Federal cost of $34,000,000 and an estimated non-Federal cost of $18,000,000. SEC. 102. SMALL FLOOD CONTROL PROJECTS. The Secretary shall conduct a study for each of the following projects and, if the Secretary determines that the project is feasible, may carry out the project under section 205 of the Flood Control Act of 1948 (33 U.S.C. 701s): (1) SOUTH UPLAND, SAN BERNADINO COUNTY, CALIFORNIA.— Project for flood control. South Upland, San Bernadino County, California. (2) BIRDS, LAWRENCE COUNTY, ILLINOIS.—Project for flood control. Birds, Lawrence County, Illinois. (3) BRIDGEPORT, LAWRENCE COUNTY, ILLINOIS.— Project for flood control, Bridgeport, Lawrence County, Illinois. (4) EMBARRAS RIVER, VILLA GROVE, ILLINOIS. —Project for flood control, Embarras River, Villa Grove, Illinois. (5) FRANKFORT, WILL COUNTY, ILLINOIS.— Project for flood control, Frankfort, Will County, Illinois. (6) SUMNER, LAWRENCE COUNTY, ILLINOIS. — Project for flood control, Sumner, Lawrence County, Illinois. (7) VERMILLION RIVER, DEMONADE PARK, LAFAYETTE, LOUISI- ANA. —Project for nonstructural flood control, Vermillion River, Demonade Park, Lafayette, Louisisma. In carrying out the study and the project (if any) under this paragraph, the Secretary shall use relevant information from the Lafayette Parish feasibility study and expedite completion of the study under this paragraph. (8) VERMILLION RIVER, QUAIL HOLLOW SUBDIVISION, LAFAY- ETTE, LOUISIANA. — Project for nonstructural flood control, Vermillion River, Quail Hollow Subdivision, Lafayette, Louisiana. In carrying out the study and the project (if any) under this paragraph, the Secretary shall use relevant information from the Lafayette Parish feasibility study and expedite completion of the study under this paragraph. (9) KAWKAWLIN RIVER, BAY COUNTY, MICHIGAN. — Project for flood control, Kawkawlin River, Bay County, Michigan. (10) WHITNEY DRAIN, ARENAC COUNTY, MICHIGAN. —Project for flood control, Whitney Drain, Arenac County, Michigan. (11) FESTUS AND CRYSTAL CITY, MISSOURI. —Project for flood control, Festus and Crystal City, Missouri. In carrying out the study and the project (if any) under this paragraph, the Secretary shall use relevant information from the existing reconnaissance study and shall expedite completion of the study under this paragraph. (12) KiMMSWiCK, MISSOURI.—Project for flood control, Kimmswick, Missouri. In carrying out the study and the project (if any) under this paragraph, the Secretary shall use relevant information from the existing reconnaissance study and shall expedite completion of the study under this paragraph. (13) RIVER DES PERES, ST. LOUIS COUNTY, MISSOURI.— Project for flood control. River Des Peres, St. Louis County, Missouri. In carrying out the study and the project (if any).