Page:United States Statutes at Large Volume 110 Part 5.djvu/608

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

110 STAT. 3682 PUBLIC LAW 104-303—OCT. 12, 1996 activities during the period in which the studies and design activities will be conducted. (c) COMPLETION OF STUDIES AND DESIGN ACTIVITIES.—In the case of any study or design documents for a flood control project that were initiated before the date of the enactment of this Act, the Secretary may complete and transmit to the appropriate non- Federal interests the study or design documents or, upon the request of such non-Federal interests, terminate the study or design activities and transmit the partially completed study or design documents to such non-Federal interests for completion. Studies and design documents subject to this subsection shall be completed without regard to the requirements of subsection (b). (d) AUTHORITY To CARRY OUT IMPROVEMENT.— (1) IN GENERAL.— Any non-Federal interest that has received from the Secretary pursuant to subsection (b) or (c) a favorable recommendation to carry out a flood control project, or separable element of a flood control project, based on the results of completed studies and design documents for the project or element may carry out the project or element if a final environmental impact statement under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) has been filed for the project or element. (2) PERMITS. —Any plan of improvement proposed to be implemented in accordance with this subsection shall be deemed to satisfy the requirements for obtaining the appropriate permits required under the Secretary's authority. Such permits shall be granted subject to the non-Federal interest's acceptance of the terms and conditions of such permits if the Secretary determines that the applicable regulatory criteria and procedures have been satisfied. (3) MONITORING. —The Secretary shall monitor any project for which a permit is granted under this subsection in order to ensure that such project is constructed, operated, and maintained in accordance with the terms and conditions of such permit. (e) REIMBURSEMENT.— (1) GENERAL RULE.— Subject to appropriations Acts, the Secretary may reimburse any non-Federal interest an amount equal to the estimate of the Federal share, without interest, of the cost of any authorized flood control project, or separable element of a flood control project, constructed pursuant to this section— (A) if, after authorization and before initiation of construction of the project or separable element, the Secretary approves the plans for construction of such project by the non-Federal interest; and (B) if the Secretary finds, after a review of studies and design documents prepared pursuant to this section, that construction of the project or separable element is economically justified and environmentally acceptable. (2) SPECIAL RULES. — (A) REIMBURSEMENT.—For work (including work associated with studies, planning, design, and construction) carried out by a non-Federal interest with respect to a project described in subsection (f), the Secretary shall, subject to amounts being made available in advance in appropriations Acts, reimburse, without interest, the non-Federal