Page:United States Statutes at Large Volume 119.djvu/1314

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

[119 STAT. 1296]
PUBLIC LAW 109-000—MMMM. DD, 2005
[119 STAT. 1296]

119 STAT. 1296

PUBLIC LAW 109–59—AUG. 10, 2005 Highway Projects High Priority Projects—Continued

No. 1020 1021 1022 1023 1024 1025 1026 1027 1028 1029 1030 1031 1032 1033 1034 1035 1036 1037 1038 1039 1040 1041 1042 1043 1044 1045 1046

VerDate 14-DEC-2004

13:51 Oct 26, 2006

Jkt 039194

PO 00002

State

Project Description

WA NJ

Alaskan Way Viaduct and Seawall ................... East Coast Greenway bicycle and pedestrian path from New Brunswick to Hudson River Construct bicycle and pedestrian underpass and park under I–95, Miami .......................... Implement Van Nuys Road and Safety Improvements ....................................................... New systems interchange ramps at SR 417 and Boggy Creek Road in Orange County, FL ..................................................................... Reconstruction of Tappan Street Bridge in Town of Newark Valley .................................. Widen Rakow Road from Ackman Road to IL Rt. 31 in McHenry County, Illinois ............... Widen U.S. Route 30 from Rock Falls to Round Grove, Whiteside County .................... Bristol, Tennessee highway-RR grade crossing improvement—Cedar Street ........................... Perform Broadway and Sheridan Road signal interconnect project, Chicago ......................... Widen U.S. Highway 30 in Whiteside County, Illinois .............................................................. Rehabilitate existing bridge and construct new bridge on Michigan Street in Sturgeon Bay, Wisconsin ......................................................... Replacement of the Route 201–A ‘‘covered’’ bridge, Norridgewock ...................................... Widen to four lanes, improvement, and other development to U.S. Highway 167 from LA State line north to I–530 ................................ Widen the Route 412 corridor from I–78 into the City of Bethlehem ..................................... Construct access road for Kahului Airport ....... Improve Highway-Railroad Crossings, Galesburg .................................................................. Sauk Rapids Bridge and Roadway Replacement in Sauk Rapids, MN .............................. Construct Transportation and Heritage Museum in Townsend, Tennessee ....................... Widen State Route 98, including storm drain developments, from Kloke Road to State Route 111, Calexico ......................................... Widen State Route 98 from Route 111 to State Route 7, Calexico ............................................. Construction of bypass around town of Hiram, from SR 92 to U.S. 278, Paulding County, Georgia ............................................................. Construction of the interchanges at BI20 and IH20 for JBS Parkway .................................... Widen State Route 46 between Airport Road and the Shandon Rest Stop in San Luis Obispo County ................................................. Widen State Route 4 (U.S. 78) from Mississippi State Line to Getwell Road (SR 176) in Memphis, Shelby County ........................... Baraga County, Reconstruction of county primary road on Bayshore Drive from Haanpaa Road northerly 1.7 miles to Whirligig Road Town of Warwick, NY walking and biking trail

FL CA FL NY IL IL TN IL IL WI ME AR PA HI IL MN TN CA CA GA TX CA TN MI NY

Frm 00153

Fmt 6580

Sfmt 6581

E:\PUBLAW\PUBL002.119

Amount

APPS06

$11,200,000 $800,000 $1,200,000 $400,000 $6,400,000 $800,000 $5,720,000 $400,000 $40,000 $1,200,000 $800,000 $5,600,000 $3,000,000 $5,000,000 $8,000,000 $800,000 $600,000 $4,800,000 $800,000 $2,400,000 $4,000,000 $1,600,000 $2,000,000 $33,461,000 $800,000 $600,000 $400,000

PsN: PUBL002