Page:United States Statutes at Large Volume 119.djvu/1359

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

[119 STAT. 1341]
PUBLIC LAW 109-000—MMMM. DD, 2005
[119 STAT. 1341]

PUBLIC LAW 109–59—AUG. 10, 2005

119 STAT. 1341

Highway Projects High Priority Projects—Continued

No. 2172 2173 2174 2175 2176

2177 2178

2179 2180 2181

2182 2183 2184

2185 2186 2187 2188 2189

2190 2191 2192 2193

VerDate 14-DEC-2004

13:51 Oct 26, 2006

State

Project Description

CA

Oregon-Page Mill expressway Improvements between U.S. 101 and SR 82, Palo Alto ........ Design and construct the Quinebaug River Rail Trail Bikeway .......................................... Park Boulevard-Harbor Drive Rail Grade Separation, San Diego ........................................... Paul Bunyan Trail, Walker to Bemidji segment ................................................................. Construct road surface improvements, and improve road safety from Brawley Water plant to Hwy 86 to 9th Street to 18th Street, Brawley ............................................................ Improvements to FM 1017 in Hebbronville ...... Alameda Corridor East Gateway to America Trade Corridor Project, Highway-Railgrade separation along 35 mile corridor from Alameda Corridor (Hobart Junction) to Los Angeles/San Bernardino County Line ................ Phase III Streetscape-Columbus ....................... Pre-construction and construction IL 15 over Wabash River at Mount Carmel .................... Queens, Bronx, and Kings, and Richmond County Graffiti Elimination Program including Kings Highway from Ocean Parkway to McDonald Avenue ........................................... Improvements at the IA 146 and I–80 interchange, Grinnell .............................................. Construct Grade separation at U.S. 277 in Eagle Pass ........................................................ Plan, design, and construct the internal roadway at Port of South Louisiana, Saint John the Baptist Parish and LA 22 in Ascension Parish ............................................................... Construction of a 2-lane on a 4-lane right-ofway bypass with controlled access on U,S, 400 at Dodge City ............................................ Reconstruct CR 203 between U.S. 10 and CSAH 1, Morrison County .............................. Reconstruction of York Street Industrial Corridor Project, Auburn, NY .............................. Construction of and improvements to Route 62 in the Village of Hamburg .............................. Convention Center Area Redevelopment Project includes street resurfacing, pedestrian walkway and streetscape improvements, signalization, safety enhancements, plaza and pedestrian area upgrades, and pedestrian bridges on South Street, Capitol Street, West Street, Missouri Street, and McCarty Street, Indianapolis ......................... Construct pedestrian urban-edge riverwalk in Montgomery, AL .............................................. Johnstown, Pennsylvania, West End bypass safety improvements ....................................... Construction of traffic and pedestrian safety improvements in Yucca Valley ....................... 710 Freeway Study to Evaluate Technical Feasibility and Impacts of a Tunnel Alternative to Close 710 Freeway Gap ..............................

MA CA MN CA

TX CA

GA IL NY

IA TX LA

KS MN NY NY IN

AL PA CA CA

Jkt 039194

PO 00002

Frm 00198

Fmt 6580

Sfmt 6581

Amount $3,200,000 $800,000 $800,000 $560,000

$1,120,000 $400,000

$12,400,000 $800,000 $5,568,000

$4,750,000 $800,000 $4,000,000

$2,200,000 $10,240,000 $268,800 $2,800,000 $800,000

$12,280,000 $1,200,000 $4,000,000 $1,600,000 $2,400,000

E:\PUBLAW\PUBL002.119

APPS06

PsN: PUBL002