Page:United States Statutes at Large Volume 119.djvu/1390

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

[119 STAT. 1372]
PUBLIC LAW 109-000—MMMM. DD, 2005
[119 STAT. 1372]

119 STAT. 1372

PUBLIC LAW 109–59—AUG. 10, 2005 Highway Projects High Priority Projects—Continued

No. 2972 2973 2974 2975

2976 2977 2978

2979

2980 2981 2982

2983

2984

2985 2986 2987 2988

2989 2990

2991 2992 2993 2994

2995 2996

VerDate 14-DEC-2004

13:51 Oct 26, 2006

Jkt 039194

PO 00002

State

Project Description

NE

Design, right-of-way and construction of South and West Beltway in Lincoln, Nebraska ....... Tower 55 CMAQ Congestion and Preliminary Engineering Study .......................................... Town of Chester, Lake Hill Farms subdivision road improvements .......................................... Improvements on TH 169 east and west of East Two Rivers Crossing and TH 135 from Enterprise Drive to TH 169 ............................ Reconstruct Standard Avenue, Whiting ............ Barron Rd. Interchange at SH 6 (Earl Rudder Freeway) College Station ................................ Develop conceptual master plan to improve the efficiency of transportation facilities, Covina ................................................................... Transportation enhancements along the Delaware Canal between Yardley, PA and Bristol, PA ............................................................... Upgrade DOT crossing #467661K to constant warning time devices ...................................... Add lighting on Highway 262 on the Navajo Nation in Aneth ............................................... Chestnut Mountain Road—Feasibility study, design, and construction start for road improvement on National Forest lands ............. Construction of roads and trails Humbug Marsh Unit Linked Greenways System, Detroit International Wildlife Refuge ................ Construct access road connecting Port of Beaumont property on east bank of Neches River to I–10 access road east of the Neches River ............................................................................... Lexington County, widen U.S. 1 and SC 6, and improve U.S. 1, SC 6, and U.S. 378 ............... Midlothian Road Signalization, Lake Zurich .... Glen Alton—Design and construction of recreation trails, access and visitor information center ................................................................ Expansion of Cass Avenue in Clinton Township ................................................................... Bromley Lane and U.S. 85 interchange feasibility study and construction of needed improvements ....................................................... Constructing Chestertown Trail, Chestertown, MD .................................................................... Eastern Peoria Bypass and (Ring Road) study and land acquisition ........................................ Conduct planning and engineering for Mayo Bridge in Richmond ........................................ Elevation of road and construction of drainage improvements on Sequams Lane Center and Sequams Lane West in the Town of Islip, NY ..................................................................... Improvements to San Juan County Road 7950 116th St/Interstate 5 Interchange Reconstruction in Marysville ............................................

TX NY MN

IN TX CA

PA

VA UT VA

MI

TX

SC IL VA

MI CO

MD IL VA NY

NM WA

Frm 00229

Fmt 6580

Sfmt 6581

E:\PUBLAW\PUBL002.119

Amount

APPS06

$3,200,000 $1,600,000 $120,000

$1,772,800 $1,040,000 $2,400,000

$172,000

$2,400,000 $137,360 $175,000

$400,000

$880,000

$1,440,000 $0 $1,600,000 $480,000

$800,000 $7,355,200

$664,000 $240,000 $2,400,000 $1,600,000

$556,000 $800,000 $1,400,000

PsN: PUBL002