Page:United States Statutes at Large Volume 119.djvu/1441

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

[119 STAT. 1423]
PUBLIC LAW 109-000—MMMM. DD, 2005
[119 STAT. 1423]

PUBLIC LAW 109–59—AUG. 10, 2005

119 STAT. 1423

Highway Projects High Priority Projects—Continued

No. 4339

4340 4341 4342 4343 4344 4345 4346 4347 4348 4349

4350 4351 4352 4353 4354 4355 4356 4357 4358 4359 4360 4361 4362

VerDate 14-DEC-2004

13:51 Oct 26, 2006

State

Project Description

MI

Improvements to Trowbridge Road Extension to Farm Lane, Ingham County, Farm Lane between Mount Hope Road and Trowbridge Road with underpasses for CN and CSX railroad crossings ............................................ Allen Road under the CN Railroad Grade Separation, Woodhaven ........................................ Blue Water Bridge Plaza improvements and relocation of segments of I–94 and I–69 ........ West Portage Avenue realignment, Sault Ste. Marie ................................................................ Construct road improvements to Van Dyke Road, from I–696 to Red Run Drain, City of Warren ............................................................. Construction of the I–696 and Northwestern Highway Interchange Freeway ramps at Franklin Road in Southfield ........................... Construct road improvements to Miller Road from I–75 to Linden Road, Flint Township ... University of Michigan Health Systems auto crash notification system ................................ Alger County, repaving a portion of H–58 between Sullivan Creek towards Little Beaver Road .................................................................. Jackson Road Boulevard Extension, utilizing fly ash and recycled concrete in road surface Transportation improvements for City of Moorhead SE Main GSI, 34th St. and I–94 Interchange and Moorhead Comprehensive Rail Safety Program in Moorhead ................. Reconstruct I–35E from University Avenue to Maryland Avenue in St. Paul ......................... Construct last segment of the Victory Drive project to link Victory Drive with Highway 14 in Blue Earth County ................................ Phase III construction of Trunk Highway 610– 10 ...................................................................... U.S. Trunk Highway 14 from One Mile West of Waseca to Owatonna .................................. Construction of 8th Street North: Stearns CR 120 to TH 15 in St. Cloud .............................. Design, engineering, and ROW acquisition to reconstruct Trunk Highway 95 bridge in North Branch ................................................... Construction and right-of-way acquisition for interchange at TH 65 and TH 242 in Blaine Design, construct, and expand TH 241 in the City of St. Michael .......................................... Design, construct, and acquire right-of-way for St. Croix River Crossing in Stillwater ........... Design and construction of Cedar Avenue Busway in Dakota County .............................. Planning and Pre-Design for Twin Cities Bioscience Corridor in St. Paul ............................ TH 23—Construction of 4-Lane Bypass in Paynesville ....................................................... I–494 U.S. 169 interchange reconstruction, Twin Cities Metropolitan Area ......................

MI MI MI MI MI MI MI MI MI MN

MN MN MN MN MN MN MN MN MN MN MN MN MN

Jkt 039194

PO 00002

Frm 00280

Fmt 6580

Sfmt 6581

Amount

$9,000,000 $6,000,000 $5,000,000 $2,000,000 $8,000,000 $3,000,000 $2,500,000 $1,500,000 $1,000,000 $1,000,000

$5,000,000 $5,000,000 $2,000,000 $9,000,000 $4,000,000 $2,000,000 $750,000 $2,000,000 $2,500,000 $9,000,000 $5,000,000 $3,000,000 $2,500,000 $2,000,000

E:\PUBLAW\PUBL002.119

APPS06

PsN: PUBL002