Page:United States Statutes at Large Volume 121.djvu/1077

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.
[121 STAT. 1056]
PUBLIC LAW 110-000—MMMM. DD, 2007
[121 STAT. 1056]

121 STAT. 1056

PUBLIC LAW 110–114—NOV. 8, 2007

dkrause on GSDDPC44 with PUBLAW

Bloomsburg, Columbia County, Pennsylvania: Report of the Chief of Engineers dated January 25, 2006, at a total cost of $44,500,000, with an estimated Federal cost of $28,925,000 and an estimated non-Federal cost of $15,575,000. (39) PAWLEYS ISLAND, SOUTH CAROLINA.—The project for hurricane and storm damage reduction, Pawleys Island, South Carolina: Report of the Chief of Engineers dated December 19, 2006, at a total cost of $8,980,000, with an estimated Federal cost of $5,840,000 and an estimated non-Federal cost of $3,140,000, and at an estimated total cost of $21,200,000 for periodic nourishment over the 50-year life of the project, with an estimated Federal cost of $10,600,000 and an estimated non-Federal cost of $10,600,000. (40) CORPUS CHRISTI SHIP CHANNEL, CORPUS CHRISTI, TEXAS.— (A) IN GENERAL.—The project for navigation and ecosystem restoration, Corpus Christi Ship Channel, Texas: Report of the Chief of Engineers dated June 2, 2003, at a total cost of $188,110,000, with an estimated Federal cost of $87,810,000 and an estimated non-Federal cost of $100,300,000. (B) NAVIGATIONAL SERVITUDE.—In carrying out the project under subparagraph (A), the Secretary shall enforce the navigational servitude in the Corpus Christi Ship Channel (including the removal or relocation of any facility obstructing the project) consistent with the cost sharing requirements of section 101 of the Water Resources Development Act of 1986 (33 U.S.C. 2211). (41) GULF INTRACOASTAL WATERWAY, BRAZOS RIVER TO PORT O’CONNOR, MATAGORDA BAY RE-ROUTE, TEXAS.—The project for navigation, Gulf Intracoastal Waterway, Brazos River to Port O’Connor, Matagorda Bay Re-Route, Texas: Report of the Chief of Engineers dated December 24, 2002, at a total cost of $17,280,000. The costs of construction of the project are to 1⁄2 from amounts appropriated from the general fund be paid 1⁄2 from amounts appropriated from the of the Treasury and Inland Waterways Trust Fund. (42) GULF INTRACOASTAL WATERWAY, HIGH ISLAND TO BRAZOS RIVER, TEXAS.—The project for navigation, Gulf Intracoastal Waterway, High Island to Brazos River, Texas: Report of the Chief of Engineers dated April 16, 2004, at a total cost of $14,450,000. The costs of construction of the project 1⁄2 from amounts appropriated from the general are to be paid 1⁄2 from amounts appropriated from fund of the Treasury and the Inland Waterways Trust Fund. (43) LOWER COLORADO RIVER BASIN PHASE I, TEXAS.—The project for flood damage reduction and ecosystem restoration, Lower Colorado River Basin Phase I, Texas: Report of the Chief of Engineers dated December 31, 2006, at a total cost of $110,730,000, with an estimated Federal cost of $69,640,000 and an estimated non-Federal cost of $41,090,000. (44) ATLANTIC INTRACOASTAL WATERWAY BRIDGE REPLACEMENT, DEEP CREEK, CHESAPEAKE, VIRGINIA.—The project for Atlantic Intracoastal Waterway Bridge Replacement, Deep Creek, Chesapeake, Virginia: Report of the Chief of Engineers dated March 3, 2003, at a total cost of $37,200,000.

VerDate Aug 31 2005

13:52 Jan 23, 2009

Jkt 059194

PO 00001

Frm 01054

Fmt 6580

Sfmt 6581

M:\STATUTES\2007\59194PT1.001

APPS10

PsN: 59194PT1