Page:United States Statutes at Large Volume 121.djvu/1110

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.
[121 STAT. 1089]
PUBLIC LAW 110-000—MMMM. DD, 2007
[121 STAT. 1089]

PUBLIC LAW 110–114—NOV. 8, 2007

121 STAT. 1089

dkrause on GSDDPC44 with PUBLAW

scientific and technical advisory organization or an eligible organization to establish a panel of experts to conduct a peer review for the project study. (2) MEMBERSHIP.—A panel of experts established for a project study under this section shall be composed of independent experts who represent a balance of areas of expertise suitable for the review being conducted. (3) LIMITATION ON APPOINTMENTS.—The National Academy of Sciences or any other organization the Chief of Engineers contracts with under paragraph (1) to establish a panel of experts shall apply the National Academy of Science’s policy for selecting committee members to ensure that members selected for the panel of experts have no conflict with the project being reviewed. (4) CONGRESSIONAL NOTIFICATION.—Upon identification of a project study for peer review under this section, but prior to initiation of the review, the Chief of Engineers shall notify the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives of the review. (d) DUTIES OF PANELS.—A panel of experts established for a peer review for a project study under this section shall— (1) conduct the peer review for the project study; (2) assess the adequacy and acceptability of the economic, engineering, and environmental methods, models, and analyses used by the Chief of Engineers; (3) receive from the Chief of Engineers the public written and oral comments provided to the Chief of Engineers; (4) provide timely written and oral comments to the Chief of Engineers throughout the development of the project study, as requested; and (5) submit to the Chief of Engineers a final report containing the panel’s economic, engineering, and environmental analysis of the project study, including the panel’s assessment of the adequacy and acceptability of the economic, engineering, and environmental methods, models, and analyses used by the Chief of Engineers, to accompany the publication of the report of the Chief of Engineers for the project. (e) DURATION OF PROJECT STUDY PEER REVIEWS.— (1) DEADLINE.—A panel of experts established under this section shall— (A) complete its peer review under this section for a project study and submit a report to the Chief of Engineers under subsection (d)(5) not more than 60 days after the last day of the public comment period for the draft project study, or, if the Chief of Engineers determines that a longer period of time is necessary, such period of time determined necessary by the Chief of Engineers; and (B) terminate on the date of initiation of the State and agency review required by the first section of the Flood Control Act of December 22, 1944 (58 Stat. 887). (2) FAILURE TO MEET DEADLINE.—If a panel of experts does not complete its peer review of a project study under this section and submit a report to the Chief of Engineers under subsection (d)(5) on or before the deadline established by paragraph (1) for the peer review, the Chief of Engineers shall complete the project study without delay.

VerDate Aug 31 2005

13:52 Jan 23, 2009

Jkt 059194

PO 00001

Frm 01087

Fmt 6580

Sfmt 6581

Reports.

Reports.

Termination date.

M:\STATUTES\2007\59194PT1.001

APPS10

PsN: 59194PT1