[121 STAT. 1276]
PUBLIC LAW 110-000—MMMM. DD, 2007
[121 STAT. 1276]

121 STAT. 1276

PUBLIC LAW 110–114—NOV. 8, 2007

dkrause on GSDDPC44 with PUBLAW

(2) MODIFICATIONS.— (A) IN GENERAL.—In carrying out each project under paragraph (1), the Secretary shall carry out such modifications as may be necessary to the ecosystem restoration features identified in the restoration plan— (i) to address the impacts of Hurricanes Katrina and Rita on the areas of the project; and (ii) to ensure consistency with the project authorized by section 7013 (including work in and around the vicinity of the Mississippi River-Gulf Outlet). (B) INTEGRATION.—The Secretary shall ensure that each modification under subparagraph (A) is taken into account in conducting the study of comprehensive hurricane protection authorized by title I of the Energy and Water Development Appropriations Act, 2006 (119 Stat. 2247). (C) MISSISSIPPI RIVER-GULF OUTLET.—In carrying out the project under paragraph (1)(A), the Secretary shall carry out such modifications as may be necessary to make the project consistent with and complementary to the closure and restoration of the Mississippi River-Gulf Outlet authorized by section 7013. (3) CONSTRUCTION REPORTS.—Before the Secretary may begin construction of any project under this subsection, the Secretary shall submit a report documenting any modifications to the project, including cost changes, to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate. (4) APPLICABILITY OF OTHER PROVISIONS.—Notwithstanding section 902 of the Water Resources Development Act of 1986 (33 U.S.C. 2280), the cost of a project under this subsection, including any modifications to the project, shall not exceed 150 percent of the cost of such project set forth in paragraph (1). (d) BENEFICIAL USE OF DREDGED MATERIAL.— (1) IN GENERAL.—The Secretary, substantially in accordance with the restoration plan, shall implement in the coastal Louisiana ecosystem a program for the beneficial use of material dredged from federally maintained waterways at a total cost of $100,000,000. (2) CONSIDERATION.—In carrying out the program under paragraph (1), the Secretary shall consider the beneficial use of sediment from the Illinois River System for wetlands restoration in wetlands-depleted watersheds of the coastal Louisiana ecosystem. (e) ADDITIONAL PROJECTS.— (1) IN GENERAL.—The Secretary is authorized to carry out the following projects referred to in the restoration plan if the Secretary determines such projects are feasible: (A) Land Bridge between Caillou Lake and the Gulf of Mexico at a total cost of $56,300,000. (B) Gulf Shoreline at Point Au Fer Island at a total cost of $43,400,000. (C) Modification of Caernarvon Diversion at a total cost of $20,700,000. (D) Modification of Davis Pond Diversion at a total cost of $64,200,000.

VerDate Aug 31 2005

13:52 Jan 23, 2009

Jkt 059194

PO 00001

Frm 01274

Fmt 6580

Sfmt 6581

M:\STATUTES\2007\59194PT1.001

APPS10

PsN: 59194PT1