Page:United States Statutes at Large Volume 68 Part 1.djvu/1296

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.
[68 Stat. 1264]
PUBLIC LAW 000—MMMM. DD, 1954
[68 Stat. 1264]

1264

PUBLIC LAW 7 8 0 - S E P T. 3, 1954

[68

ST AT.

SANTA MARIA RIVER B A S I N

The project for flood protection on Santa Maria Eiver and tributaries, California, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 400, Eighty-third Congress, at an estimated cost of $10,182,000 for levees and channel improvements to be prosecuted under the direction of the Secretary of the Army and supervision of the Chief of Engineers. SAN LORENZO RIVER B A S I N

The project for flood protection on San Lorenzo River, California, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 447, Eighty-third Congress, at an estimated cost of $2,665,000. SACRAMENTO RIVER BASIN

The project for flood protection on Middle Creek, California, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers, in House Document Numbered 367, Eighty-first Congress, at an estimated cost of $1,110,000. The plan of improvement for flood control on the American River, California, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers, in House Document Numbered -367, Eighty-first Congress, at an estimated cost of $1,600,000 for levees. LOWER SAN J O A Q U I N RIVER B A S I N

^propriation. 58 Stat. 9 0 1.

In addition to previous authorizations, there is hereby authorized to be appropriated the sum of $5,000,000 for the prosecution of the comprehensive plan for the Lower San Joaquin River Basin, California, approved in the Act of December 22, 1944, as amended and supplemented by subsequent Acts of Congress. SAN LORENZO CREEK B A S I N

The project for flood protection on San Lorenzo Creek, Alameda County, California, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 452, Eighty-third Congress, at an estimated cost of $3,790,000. T R U C K E E RIVER BASIN

The project for flood protection on Truckee River and tributaries, California and Nevada, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in his report dated April 15, 1954, at an estimated cost of $791,000: Provided, That the authorization for improvement for flood control on Truckee River, California and Nevada, contained herein shall not become effective unless and until the "Washoe Reclamation Project" on the Truckee and Carson Rivers, California and Nevada, shall have been authorized pursuant to law. COLUMBIA RIVER B A S I N

Appropriation.

In addition to previous authorizations, there is hereby authorized to be appropriated the sum of $180,000,000 for the prosecution of the projects and plans for the Columbia River Basin, for which the sum of $75,000,000 was authorized in the Flood Control Act approved