Page:United States Statutes at Large Volume 72 Part 1.djvu/340

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.
[72 Stat. 298]
PUBLIC LAW 85-000—MMMM. DD, 1958
[72 Stat. 298]

298 Louisiana.

PUBLIC LAW 85-600-JULY 3, 1958

[72 ST'AT.

Barataria Bay, Louisiana: House Document Numbered 82, Eightyfifth Congress, at an estimated cost of $1,647,000; Chefuncte River and Bogue Falia, Louisiana: Senate Document Numbered 54, Eighty-fifth Congress, at an estimated cost of $48,000; Texas* Pass Cavallo to Port Lavaca, Texas: House Document Numbered 131, Eighty-fourth Congress, at an estimated cost of $413,000; Galveston Harbor and Houston Ship Channel, Texas: House Document Numbered 350, Eighty-fifth Congress, at an estimated cost of $17,196,000; Matagorda Ship Channel, Port Lavaca, Texas: House Document Numbered 388, Eighty-fourth Congress, at an estimated cost of $9,944,000; Port Aransas-Corpus Christi Waterway, Texas: House Document Numbered 361, Eighty-fifth Congress, at an estimated cost of $6,272,000; Port Aransas-Corpus Christi Waterway, Texas, La Quinta Channel: Senate Document Numbered 33, Eighty-fifth Congress, at an estimated cost of $954,000; Freeport Harbor, Texas: House Document Numbered 433, Eightyfourth Congress^ at an estimated cost of $317,000; M i s 8 i s s ippi Mississippi River between Missouri River and Minneapolis, MinneRiver. sota, damage to levee and drainage districts: House Document Numbered 135j Eighty-fourth Congress, at an estimated cost of $2,476,000; Illinois. Mississippi River at Alton, Illinois, commercial harbor: House Document Numbered 136, Eighty-fourth Congress, at an estimated cost of $246,000; Mississippi River at Alton, Illinois, small-boat harbor: House Document Numbered 136, Eighty-fourth Congress, at an estimated cost of $101,000; Iowa. Mississippi River at Clinton, Iowa, Beaver Slough: House Document Numbered 345, Eighty-fourth Congress, at an estimated cost of $241,000; Mississippi River at Clinton, Iowa, report on damages: House Document Numbered 412, Eighty-fourth Congress, at an estimated cost of $147,000; Missouri. Mississippi River between Saint Louis, Missouri, and Lock and Dam Numbered 26: Senate Document Numbered 7, Eighty-fifth Congress, at an estimated cost of $5,802,000; Minnesota. Mississippi River between the Missouri River and Minneapolis, Minnesota: Modification of the existing project in the Mississippi River at Saint Anthony Falls, Minneapolis, Minnesota, House Document Numbered 33, Eighty-fifth Congress; Minnesota River, Minnesota: Senate Document Numbered 144, Eighty-fourth Congress, at an estimated cost of $2,539,000: Provided, That the channel may be extended five-tenths of a mile upstream to mile 14.7 at an estimated additional cost of $5,000; Ohio. Vermilion Harbor, Ohio: House Document Numbered 231, Eightyfifth Congress, at an estimated cost of $474,000; Ohio River at Gallipolis, Ohio: House Document Numbered 423, Eighty-fourth Congress, at an estimated cost of $66,000; Kentucky. Licking River, Kentucky: House Document Numbered 434, Eightyfourth Congress, maintenance; Wisconsin. Saxon Harbor, Wisconsin: House Document Numbered 169, Eightyfifth C o n f e s s, at an estimated cost of $393,500; Two Rivers Harbor, Wisconsin: House Document Numbered 362, Eighty-fourth Congress, at an estimated cost of $66,000; Port Washington Harbor, Wisconsin: House Document Numbered 446, Eighty-third Congress, at an estimated Federal cost of $2,181,000: Provided., That local interests shall contribute 30 per cent of the total cost of the project;