(Vicksburg-Yazoo a r e a): House Document Numbered 93-149, at an estimated cost of $150,000. The project for flood control and other purposes for the Bushley Bayou area of the Red River backwater area, Louisiana: House Document Numbered 93-157, at an estimated cost of $300,000. P E E DEE RIVER

BASIN

The project for flood control and other purposes on Roaring River Reservoir, North Carolina: in accordance with the recommendations of the Secretary of the Army in his report dated April 12, 1971, on the Development of Water Resources in Appalachia, at an estimated cost of $400,000. A L T A M A H A RIVER

BASIN

The project for flood control and other purposes at Curry Creek Reservoir, Georgia: in accordance with the recommendations of the Secretary of the Army in his report dated April 12, 1971, on the Development of Water Resources in Appalachia, at an estimated cost of $400,000. COOSA RIVER

BASIN

The project for flood control and other purposes at Dalton Reservoir, Conasauga River, Georgia: in accordance with the recommendations of the Secretary of the Army in his report dated April 12, 1971, on the Development of Water Resources in Appalachia, at an estimated cost of $440,000. GUADALUPE RIVER B A S I N

^

The project for flood control and other purposes on the Blanco River at Clopton Crossing, Texas: House Document Numbered 92-364, at an estimated cost of $177,000. A R K A N S A S RIVER

BASIN

The project for flood protection and other purposes on the Arkansas River and tributaries above John Martin Dam, Colorado: House Document Numbered 93-143, at an estimated cost of $1,140,000. SPRING RIVER

|

BASIN

The project for flood control and other purposes on Center Creek near Joplin, Missouri: House Document Numbered 92-361, at an estimated cost of $150,000. COLUMBIA RIVER

BASIN

The project for installation of power generating facilities at the Libby Reregulating Dam, Kootenai River, Montana: Senate Document Numbered 93-29, at an estimated cost of $75,000. U M P Q U A RIVER

BASIN

The project for flood protection and other purposes at the Days' Creek Dam, South Umpqua River, Oregon: House Document Numbered 92-371, at an estimated cost of $400,000. (b) The Secretary of the Army is authorized to undertake advanced engineering and design for the projects in subsection (a) of this section after completion of the phase I design memorandum stage of such Finding by projects. Such advanced engineering and design may be undertaken Chief of E n g i only upon a finding by the Chief of Engineers, transmitted to the neers,transmittal to c o n g r e s s i o n a l committees.