Page:United States Statutes at Large Volume 96 Part 1.djvu/1303

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

PUBLIC LAW 97-000—MMMM. DD, 1982

PUBLIC LAW 97-293—OCT. 12, 1982

96 STAT. 1261

Public Law 97-293 97th Congress An Act To authorize the Secretary of the Interior to construct, operate, and maintain modifications of the existing Buffalo Bill Dam and Reservoir, Shoshone project, Pick-Sloan Missouri Basin program, Wyoming, and for other purposes.

Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled, TITLE I CONSTRUCTION OF DAM MODIFICATIONS

Oct. 12, 1982 [S. 1409]

Buffalo Bill Dam and Reservoir, Shoshone project, Pick-Sloan Missouri Basin program, Wyo.

SEC. 101. The Secretary of the Interior, acting pursuant to Federal reclamation law (Act of June 17, 1902, 32 Stat. 388 aM Acts amenda- Post, p. 1263 tory thereof and supplemental thereto), is hereby authorized to construct, operate, and maintain modifications to the Buffalo Bill Dam and Reservoir, Shoshone project, Pick-Sloan Missouri Basin program, Wyoming, for the purposes of providing approximately seventy-four thousand acre-feet of additional water annually for irrigation, municipal and industrial use, increased hydroelectric power generation, outdoor recreation, fish and wildlife conservation and development, environmental quality, and other purposes. The principal modifications to the Buffalo Bill Dam and Reservoir shall include raising the height of the existing Buffalo Bill Dam by twenty-five feet, enlarging the capacity of the existing Buffalo Bill Reservoir by approximately two hundred and seventy-one thousand acre-feet, replacing the existing Shoshone Powerplant, enlarging a spillway, construction of a visitor's center, dikes and impoundments^ and necessary facilities to effect the aforesaid purposes of the modifications. These modifications are hereby authorized as part of the Pick-Sloan Missouri Basin program: Provided, That the powerplant authorized by this section shall be designed, constructed, and operated in such a manner as to not limit, restrict, or alter the release of water from any existing reservoir, impoundment, or canal adverse to the satisfaction of valid existing water rights or water delivery to the holder of any valid water service contract. CONSERVATION AND FISH AND WILDLIFE

SEC. 102. The conservation and development of the fish and wildlife resources and the enhancement of recreation opportunities in connection with the modification of Buffalo Bill Dam and Reservoir shall be in accordance with the Federal Water Project Recreation Act (79 Stat. 213), as amended. COORDINATION WITH OTHER LAWS

SEC. 103. The modifications of the Buffalo Bill Dam and Reservoir shall be integrated physically and financially with the other Federal works constructed under the comprehensive plan approved by sec-

16 USC 406Z-12.