Page:United States Statutes at Large Volume 100 Part 5.djvu/707

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

PUBLIC LAW 99-000—MMMM. DD, 1986

PUBLIC LAW 99-662—NOV. 17, 1986

100 STAT. 4181

the New Jersey Intracoastal Waterway in Cape May County to 15 feet. SEC. 861. FORT PECK, MONTANA.

The project for navigation and power generation, Fort Peck, Montana, authorized by the Act entitled "An Act to authorize the completion, maintenance, and operation of the Fort Peck project for navigation, and for other purposes", approved May 18, 1938 (16 U.S.C. 833), shall include recreation as a purpose of such project.

>

u'

SEC. 862. FISHTRAP LAKE, KENTUCKY.

The project for Fishtrap Lake, Pike County, Kentucky, authorized as part of the flood control project for the Ohio River Basin by section 4 of the Flood Control Act approved June 28, 1938 (52 Stat. 1217), is modified to authorize the Secretary, notwithstanding the completion of such project in 1968, to carry out planning, engineering, and design for a project (1) to acquire by purchase any property in the drainage area for Fishtrap Lake, Kentucky, which is being used as a residence and any property in such drainage area which is being used as a cemetery, and (2) to relocate the owners of any property so acquired and any cemetery so acquired, SEC. 863. SABINE RIVER CHANNEL, TEXAS. The Sabine River channel of the Sabine-Neches Waterway, Texas, authorized by the River and Harbor Act of 1954, is modified to 68 Stat. 1248. authorize the Secretary to carry out planning, engineering, and design for a project to extend such channel at a depth of 30 feet and a width of 200 feet, from its present upstream terminus opposite Green Avenue in Orange, Texas, generally following the present river alignment a distance of approximately one and one-quarter miles to a point opposite Little C3T)ress Bayou. SEC. 864. CLARKS HILL RESERVOIR, SAVANNAH RIVER BASIN, GEORGIA.

The project for flood control, Clarks Hill Reservoir, Savannah Fish and fishing. River Basin, Georgia and South Carolina, authorized by the Flood Wildlife. ^, Control Act approved December 22, 1944, is modified to include 58 Stat. 887. recreation and fish and wildlife management as project purposes. Project lands which are managed or reserved as of the date of the enactment of this section for the conservation, enhancement, or

,! lo col'

preservation of fish and wildlife and for recreation shall be considered as lands necessary for such purposes. SEC. 865. CAPE CHARLES CITY HARBOR, VIRGINIA.

The project for navigation, Cape Charles City Harbor, Virginia, authorized by the River and Harbor Act approved March 2, 1945 (59 Stat. 15), is modified to provide that the local interests shall not be required— (1) to provide bulkheads, or (2) to reserve berthing space for general public use, along a greater distance of the shoreline than such bulkheads are provided or such berthing space is reserved on the date of the enactment of this Act. SEC. 866. EAST CHESTER CREEK, NEW YORK. The project for navigation. East Chester Creek, New York, authorized by the River and Harbor Act of 1950, is modified to provide 64 Stat. 163. that the Secretary, out of any amounts made available to the Secretary for operation and maintenance of water resources