Page:United States Statutes at Large Volume 101 Part 1.djvu/225

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

PUBLIC LAW 100-000—MMMM. DD, 1987

PUBLIC LAW 100-17—APR. 2, 1987

101 STAT. 195

(95) ROUTE 3, MARYLAND.—The Secretary is authorized to

carry out a project to construct an interchange to connect Maryland Route 3 and Belair Drive. (96) ROUTE 197, MARYLAND.—The Secretary is authorized to

carry out a project to construct a 4-lane divided highway to bypass Bowie, Maryland, from Rustic Hill Drive to south of the Amtrak line in Prince Georges County. (97) MARYLAND ROUTE II5.—The Secretary is authorized to carry out a project to relocate Maryland Route 115 from Montgomery Village Avenue to Shady Grove Road, Montgomery County. This project involves the construction of a 4-lane divided highway. (98) MARYLAND ROUTE 213.—The Secretary is authorized to carry out a project to rehabilitate the Chester River Bridge on Maryland Route 213 at Chestertown, Maryland. (99) MARYLAND ROUTE 838.—The Secretary is authorized to carry out a project to replace a bridge connecting Maryland Route 838 to the Wye Island natural resources management area. (100) BELCHERTOWN, MASSACHUSETTS.—The Secretary is au-

thorized to carry out a project to construct a road of approximately 3,600 feet between Liberty Street and Massachusetts Route 21 in Belchertown, Massachusetts. (101) MICHIGAN.—The Secretary is authorized to carry out— (A) a project for construction of the United States Route 31 freeway in Mason County, Michigan, from the south county line northward 11.1 miles to United States Route 10; (B) improvements, including road widening and resurfacing to existing United States Routes 10 and 31 from the United States Route 10-United States Route 31 interchange east to Scotville, Michigan; and (C) improvements on United States Route 31 from Scotville north seventeen miles to Preuss Road in Manistee County, Michigan. (102) BLOOMINGTON, MINNESOTA.—The Secretary is authorized to carry out a project for the design and site location for the replacement of the Bloomington Ferry Bridge, located in Hennepin and Scott Counties, Minnesota. (103) N E W AUGUSTA, MISSISSIPPI.—The Secretary is authorized to carry out a project to widen 14.7 miles of United States Highway 98 from 1.5 miles east of United States Highway 49 in Forrest County, east to State Route 29 in New Augusta, Mississippi. (104) HIGHWAY 30, NEBRASKA.—The Secretary is authorized to carry out a project to replace the bridge that carries Highway 30 over the Missouri River between Blair, Nebraska and Missouri Valley, Iowa. (105) LAS VEGAS, NEVADA.—The Secretary is authorized to carry out a project to construct an interchange at Sahara Avenue and Interstate Route 1-15, in the city of Las Vegas, Nevada. (106) HENDERSON, NEVADA.—The Secretary is authorized to carry out a project to improve the Boulder Highway in Henderson, Nevada The project involves 6.36 miles along United States Route 93/95 from the intersection of Sunset Road to the intersection of Horizon Drive.