Page:United States Statutes at Large Volume 103 Part 1.djvu/670

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

103 STAT. 642 PUBLIC LAW 101-101—SEPT. 29, 1989 to initiate and complete a reconnaissance phase study of roadway access problems at Fishtrap Lake, Kentucky, and the purchase of property from willing sellers and relocation of owners of property so purchased: Provided further. That with funds appropriated in the Energy and Water Development Appropriations Act, 1989, Public Law 100-371, the Secretary of the Army, acting through the Chief of Engineers, is directed to initiate preconstruction engineering and design for construction of a bridge at Floyd's Fork, on Routt Road at Taylorsville Lake, Kentucky: Provided further. That the Secretary of the Army, acting through the Chief of Engineers, is directed to use, immediately upon enactment of this Act, $125,000 of the funds appropriated herein to accomplish detailed planning of the Wabash Valley Scenic Corridor at Lafayette, Indiana, under the authorized Wabash River Basin Comprehensive Study: Provided further. That 33 USC 988 note, within available funds, the Secretary of the Army, acting through the Chief of Engineers, is directed to initiate and complete a recon- naissance study for the Saint Lawrence Seaway and Great Lakes- Financing Navigational Improvements Study, as authorized in sec- tion 47(d) of Public Law 100-676, in accordance with the cost sharing provisions of Public Law 99-662: Provided further, That $150,000 of the funds herein appropriated for the Eastern North Carolina above Cape Lookout, North Carolina, study, shall be used by the Secretary of the Army, acting through the Chief of Engineers, to conduct basic hydrologic, water quality, and land use studies of the Albemarle and Pamlico Sounds in support of the Albemarle-Pamlico Estuarine study under the National Estuarine Study Program: Provided fur- ther, That the Secretary of the Army, acting through the Chief of Engineers, using $100,000 of the funds herein appropriated, is di- rected to complete preconstruction engineering and design nec- essary to prepare the Big and Little Sallisaw Creeks, Oklahoma, project, authorized by the Water Resources Development Act of 1976, for construction: Provided further. That with funds appro- priated in the Energy and Water Development Appropriations Act, 1989, Public Law 100-371, the Secretary of the Army, acting through the Chief of Engineers, is directed to initiate and complete a study to determine the feasibility of the Winton Woods, Mill Creek Lake, Ohio, project under authority of section 1135 of the Water Resources Development Act of 1986: Provided fuHher, That $90,000 of the funds herein appropriated shall be used by the Army Corps of Engineers to complete a comprehensive reconnaissance study of coastal erosion controls for the Portuguese Bend landslide in the immediate, urban Los Angeles, California, area: Provided further. That the Secretary of the Army, acting through the Chief of Engi- neers, is directed to utilize funds previously appropriated under the Flood Control, Mississippi River and Tributaries account to prepare the most cost effective plan to provide the authorized level of protection for flood damage reduction for the entire city of West Memphis, Arkansas, and vicinity, without regard to frequency of flooding, drainage area, and amount of runoff: Provided further. That the Secretary of the Army, acting through the Chief of Engi- neers, is directed to utilize previously appropriated funds together with funds appropriated herein to complete in fiscal year 1990 the engineering and design on the Port Sutton Channel, Tampa Harbor, Florida, project: Provided further. That the Secretary of the Army, acting through the Chief of Engineers, is directed to use $500,000 of the funds appropriated herein for preconstruction engineering and design of structures to restore the riverbed gradient in the vicinity