Page:United States Statutes at Large Volume 107 Part 2.djvu/361

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

PUBLIC LAW 103-126—OCT. 28, 1993 107 STAT. 1313 Hazard, Kentucky, $250,000; Brockton, Massachusetts, $350,000; Passaic River Mainstem, New Jersey, $17,000,000; Broad Top Region, Pennsylvania, $400,000; Juniata River Basin, Pennsylvania, $450,000; Lackawanna River Basin Greenway Corridor, Pennsylvania, $300,000; Jennings Randolph Lake, West Virginia, $400,000; Monongahela River Comprehensive, West Virginia, $600,000; and West Virginia Comprehensive, West Virginia, $500,000: Provided, That notwithstanding ongoing studies using previously appropriated funds, and using $2,000,000 of the funds appropriated herein, the Secretary of the Army, acting through the Cnief of Engineers, is directed to conduct hydraulic modeling, foundations analysis and related design, and mapping efTorts in continuing preconstruction engineering and design for the additional lock at the Kentucky Dam, Kentucky, project, in accordance with the Kentucky Lock Addition Feasibility Report approved by Report of the Chief of Engineers dated June 1, 1992: Provided further, That using $250,000 of the funds appropriated herein, the Secretary of the Army, acting through the Chief of Engineers, is directed to include the study of the Alafla River as part of the Tampa Harbor, Alafia River and Big Bend, Florida, feasibility study: Provided further. That the Secretary of the Army, acting through the Chief of Engineers, is directed to use $250,000 of available funds to complete a detailed project report, and plans and specifications for a permanent shore erosion protection project at Geneva State Park, Ashtabula County, Ohio: Provided further. That the Secretary of the Army, acting through the Chief of Engineers, is directed to use $400,000 of the funds appropriated herein to continue preconstruction engineering and design, including preparation of the special design report, initiation of National Environmental Policy Act document preparation, and initiation of hydraulic model studies for the Kaumalapau Harbor navigation study, Lanai, Hawaii: Provided further. That using $4,000,000 of the funds appropriated herein, the Secretary of the Army, acting through the Chief of Engineers, is directed to proceed with detailed designs and plans and specifications, including detailed cost estimates, for the master plan of the Indianapolis, White River, Central Waterfront, Indiana, project: Provided further. That the Secretary of the Army is directed to limit the Columbia River Navigation Channel, Oregon and Washington, feasibility study to the investigation of the feasibility of constructing a navigation channel not to exceed 43 feet in depth from the Columbia River entrance to the Port of Portland/Port of Vancouver and to modify the Initial Project Management Plan accordingly: Provided further. That the Secretary of the Army, acting through the Chief of Engineers, is directed to use $400,000 of the funds appropriated herein to initiate a reconnaissance study, including economic and environmental studies, for the Pocataligo River and Swamp, South Carolina, project: Provided further. That the Secretary of the Army, acting through the Chief of Engineers, is directed to use $90,000 of the funds appropriated herein to complete the reconnaissance study of the Black Fox and Oakland Spring wetland area in Murfreesboro, Tennessee: Provided further, Tnat the Secretary of the Army, acting through the Chief of Engineers, is directed to utilize $200,000 of available funds to initiate