Page:United States Statutes at Large Volume 107 Part 2.djvu/953

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

PUBLIC LAW 103-160—NOV. 30, 1993 107 STAT. 1903 (2) The electric power distribution system referred to in paragraph (1) is the electric power distribution system located at the Naval Air Station, Alameda, California, including such utility easements and right of ways as the Secretary and the Bureau consider to be necessary or appropriate to provide for ingress to and egress from the electric power distribution system. (b) REQUIREMENT REIJVTING TO CONVEYANCE. —The Secretary may not carry out the conveyance of the electric power distribution system authorized by subsection (a) unless the Bureau agrees to accept the system in its existing condition at the time of the convey- ance. (c) CONDITIONS.—The conveyance of the electric power distribution system authorized in subsection (a) shall be subject to the following conditions: (1) That the Bureau provide electric power to the Naval Air Station at a rate that is no less favorable than the rate the Bureau would charge a public or private consumer of electricity similar to the Naval Air Station for the provision and distribution of electricity. (2) That the Bureau comply with all applicable environmental laws and regulations, including any permit or license requirements, in providing and distributing electricity at the Naval Air Station through the electric power distribution system. (3) That the Bureau not commence any expansion of the electric power distribution system without the approval of the expansion by the Secretary. (4) That the Bureau assimie the responsibility for ownership, operation, maintenance, repair, and safety inspections for the electric power distribution system. (d) FAIR MARKET VALUE.—The Secretary shall ensure that the value to the Navy of the actions taken by the Bureau in accordance with subsection (c) is at least equal to the fair market value of the electric power distribution system conveyed pursuant to subsection (a). (e) REVERSION.—If the Secretary determines at any time that the Bureau is not complying with the conditions specified in subsection (c), all right, title,, and interest of the Bureau in and to the electric power distribution system conveyed pursuant to subsection (a), including any improvements or modifications to the system, shall revert to the United States and the United States shall have the right of immediate access to the system, including the right to operate the system. (0 DESCRIPTION OF PROPERTY. —The exact legal description of the electric power distribution system to be conveyed pursuant to subsection (a), including any easements granted as part of the conveyance, shall be determined in a manner, including by survey, satisfactory to the Secretary. The cost of any survey or other services performed at the direction of the Secretary pursuant to the authority in the preceding sentence shall be borne by the Bureau. (g) ADDITIONAL TERMS AND CONDITIONS. — The Secretary may require such additional terms and conditions in connection with the conveyance under subsection (a) and the grant of any easement as part of the conveyance as the Secretary considers appropriate to protect the interests of the United States.