Page:United States Statutes at Large Volume 110 Part 4.djvu/144

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

110 STAT. 2990 PUBLIC LAW 104-206—SEPT. 30, 1996 cost of $20,300,000 and an estimated first non-Federal cost of $5,900,000. SEC. 104. The project for navigation. Grays Landing Lock and Dam, Monongahela River, Pennsylvania (Lock and Dam 7 Replacement), authorized by section 301(a) of the Water Resources Development Act of 1986 (Public Law 99-662, 100 Stat. 4110) is modified to authorize the Secretary of the Army to construct the project at a total cost of $181,000,000, with an estimated first Federal cost of $181,000,000. Effective date. SEC. 105. From the date of enactment of this Act, non-structural flood control measures implemented under section 202(a) of Public Law 96-367 shall prevent future losses that would occur from a flood equal in magnitude to the April 1977 level by providing protection from the April 1977 level or the 100-year frequency event, whichever is greater. SEC. 106. Notwithstanding any other provision of law, the Secretary of the Army, acting through the Chief of Engineers, is authorized to reprogram, obligate and expend such additional sums as are necessary to continue construction and cover anticipated contract earnings of any water resources project that received an appropriation or allowance for construction in or through an appropriations Act or resolution of the then-current fiscal year or the two fiscal years immediately prior to that fiscal year, in order to prevent the termination of a contract or the delay of scheduled work. SEC. 107. The Corps of Engineers is hereby directed to complete the Charleston Riverfront (Haddad) Park Project, West Virginia, as described in the design memorandum approved November, 1992, on a 50-50 cost-share basis with the City. The Corps of Engineers shall pay one-half of all costs for settling contractor claims on the completed project and for completing the wharf. The Federal portion of these costs shall be obtained by reprogramming available Operations & Maintenance funds. The project cost limitation in the Project Cooperation Agreement shall be increased to reflect the actual costs of the completed project. SEC. 108. The flood control project for Arkansas City, Kansas authorized by section 401(a) of the Water Resources Development Act of 1986 (Public Law 99-662, 100 Stat. 4116) is modified to authorize the Secretary of the Army to construct the project at a total cost of $38,500,000, with an estimated first Federal cost of $28,100,000 and an estimated first non-Federal cost of $10,400,000. SEC. 109. Funds previously provided under the Fiscal Year 1993 Energy and Water Development Appropriations Act, Public Law 102-377, for the Elk Creek Dam, Oregon project, are hereby made available to plan and implement long-term management measures at Elk Creek Dam to maintain the project in an uncompleted state and to take necessary steps to provide passive fish passage through the project. SEC. 110. The Secretary of the Army is authorized and directed to modify the project for the Hudson River, New York, New York City to Waterford, authorized by the Act of June 25, 1910 (Public Law 264, 61st Congress, 36 Stat. 635), to include design and construction of a 300-foot wide channel to a depth of 24 feet (mean low water), extending from the existing Federal channel in the vicinity of the Hudson City Light to the north dock at Union Street, Athens, New York.