Page:United States Statutes at Large Volume 114 Part 2.djvu/678

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

114 STAT. 1441A-60 PUBLIC LAW 106-377—APPENDIX B CONSTRUCTION, GENERAL For the prosecution of river and harbor, flood control, shore protection, and related projects authorized by laws; and detailed studies, and plans and specifications, of projects (including those for development with participation or under consideration for participation by States, local governments, or private groups) authorized or made eligible for selection by law (but such studies shall not constitute a commitment of the Government to construction), $1,717,199,000, to remain available until expended, of which such sums as are necessary for the Federal share of construction costs for facilities under the Dredged Material Disposal Facilities program shall be derived from the Harbor Maintenance Trust Fund, as authorized by Public Law 104—303; and of which such sums as are necessary pursuant to Public Law 99-662 shall be derived from the Inland Waterways Trust Fund, for one-half of the costs of construction and rehabilitation of inland waterways projects, including rehabilitation costs for the Lock and Dam 12, Mississippi River, Iowa; Lock and Dam 24, Mississippi River, Illinois and Missouri; Lock and Dam 3, Mississippi River, Minnesota; and London Locks and Dam, and Kanawha River, West Virginia, projects; and of which funds are provided for the following projects in the amounts specified: Elba, Alabama, $8,400,000; Geneva, Alabama, $10,800,000; San Gabriel Basin Groundwater Restoration, California, $25,000,000; San Timoteo Creek (Santa Ana River Mainstem), California, $5,000,000; Indianapolis Central Waterfront, Indiana, $10,000,000; Southern and Eastern Kentucky, Kentucky, $4,000,000; Clover Fork, Middlesboro, City of Cumberland, Town of Martin, Pike County (including Levisa Fork and Tug Fork Tributaries), Bell County, Martin County, and Harlan County, Kentucky, elements of the Levisa and Tug Forks of the Big Sandy River and Upper Cumberland River, Kentucky, $20,000,000: Provided, That the Secretary of the Army, acting through the Chief of Engineers, is directed to proceed with planning, engineering, design and construction of the Town of Martin, Kentucky, element, in accordance with Plan A as set forth in the preliminary draft Detailed Project Report, Appendix T of the General Plan of the Huntington District Commander; Jackson County, Mississippi, $2,000,000; Bosque and Leon Rivers, Texas, $4,000,000; and Upper Mingo County (including Mingo County Tributaries), Lower Mingo County (Kermit), Wayne County, and McDowell County, elements of the Levisa and Tug Forks of the Big Sandy River and Upper Cumberland River project in West Virginia, $4,100,000: Provided further. That using $900,000 of the funds appropriated herein, the Secretary of the Army, acting through the Chief of Engineers, is directed to undertake the Bowie County Levee project, which is defined as Alternative B Local Sponsor Option, in the Corps of Engineers document entitled Bowie County Local Flood Protection, Red River, Texas, Project Design Memorandum No. 1, Bowie County Levee, dated April 1997: Provided further. That