Page:United States Statutes at Large Volume 115 Part 1.djvu/513

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

PUBLIC LAW 107-66—NOV. 12, 2001 115 STAT. 491 dredged material: Provided further, That using funds appropriated herein, the Secretary of the Army, acting through the Chief of Engineers, is directed to perform cultural resource mitigation and recreation improvements at Waco Lake, Texas, at full Federal expense notwithstanding the provisions of the Water Supply Act of 1958: Provided further. That the Secretary of the Army, acting through the Chief of Engineers, is directed to use funds appropriated herein to grade the basin within the Hansen Dam feature of the Los Angeles County Drainage Area, California, project to enhance and maintain flood capacity and to provide for future use of the basin for compatible purposes consistent with the Master Plan, including recreation and environmental restoration: Provided further, That the Secretary of the Army, acting through the Chief of Engineers, is directed to use funds appropriated herein to fully investigate the development of an upland disposal site recycling program on the Black Warrior and Tombigbee Rivers, Alabama- Coosa Rivers, and the Mobile River projects: Provided further, That of funds appropriated herein for the Intracoastal Waterway, Delaware River to Chesapeake Bay, Delaware and Maryland, the Secretary of the Army, acting through the Chief of Engineers, is directed to reimburse the State of Delaware for normal operation and maintenance costs incurred by the State of Delaware for the SRI Bridge from station 58 + 00 to station 293 + 00 between May 12, 1997 and September 30, 2002. Reimbursement costs shall not exceed $1,277,000: Provided further, That the Secretary of the Army, acting through the Chief of Engineers, is directed to use funds appropriated herein to remove and reinstall the docks and causeway, in kind, and continue breakwater repairs at Astoria East Boat Basin, Oregon: Provided further. That using funds appropriated herein, the Secretary of the Army, acting through the Chief of Engineers, is directed to dredge a channel from the mouth of Wheeling Creek to Tunnel Green Park in Wheeling, West Virginia: Provided further, That the project for the Apalachicola, Chattahoochee, and Flint Rivers Navigation, authorized by section 2 of the River and Harbor Act of March 2, 1945 (Public Law 79- 14) and modified by the first section of the River and Harbor Act of 1946 (60 Stat. 635, chapter 595), is modified to authorize the Secretary, as part of navigation maintenance activities, to develop and implement a plan to be integrated into the longterm dredged material management plan being developed for the Corley Slough reach, as required by conditions of the State of Florida water quality certification, for periodically removing sandy dredged material from the disposal area known as Site 40, located at mile 36.5 of the Apalachicola River, and from other disposal sites that the Secretary may determine to be needed for the purpose of reuse of the disposal areas, by transporting and depositing the sand for environmentally acceptable beneficial uses in coastal areas of Florida to be determined in coordination with the State of Florida: Provided further, That the Secretary is authorized to acquire all lands, easements, and rights-of-way that may be determined by the Secretary, in consultation with the affected State, to be required for dredged material disposal areas to implement a long-term dredge material management plan: Provided further. That the long-term Deadline, management plan shall be developed in coordination with the State of Florida no later than 2 years from the date of enactment of this Act: Provided further. That, of the funds herein, $4,900,000 shall be made available for these purposes and $8,000,000 shall 89-194O -03 -17 QL3 Part 1