Page:United States Statutes at Large Volume 118.djvu/1867

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

118 STAT. 1837 PUBLIC LAW 108–375—OCT. 28, 2004 General of the United States shall carry out an assessment of the extent to which the Missile Defense Agency achieved the goals established under subsection (c) for that fiscal year for each ballistic missile defense program of the Department of Defense. ‘‘(2) Not later than February 15 of each of 2003 through 2007, the Comptroller General shall submit to the congressional defense committees a report on the Comptroller General’s assessment under paragraph (1) with respect to the preceding fiscal year.’’. SEC. 234. BASELINES AND OPERATIONAL TEST AND EVALUATION FOR BALLISTIC MISSILE DEFENSE SYSTEM. (a) TESTING CRITERIA.—Not later than February 1, 2005, the Secretary of Defense, in consultation with the Director of Oper ational Test and Evaluation, shall prescribe appropriate criteria for operationally realistic testing of fieldable prototypes developed under the ballistic missile defense spiral development program. The Secretary shall submit a copy of the prescribed criteria to the congressional defense committees. (b) USE OF CRITERIA.—(1) The Secretary of Defense shall ensure that, not later than October 1, 2005, a test of the ballistic missile defense system is conducted consistent with the criteria prescribed under subsection (a). (2) The Secretary of Defense shall ensure that each block configuration of the ballistic missile defense system is tested con sistent with the criteria prescribed under subsection (a). (c) RELATIONSHIP TO OTHER LAW.—Nothing in this section shall be construed to exempt any spiral development program of the Department of Defense, after completion of the spiral development, from the applicability of any provision of chapter 144 of title 10, United States Code, or section 139, 181, 2366, 2399, or 2400 of such title in accordance with the terms and conditions of such provision. (d) EVALUATION.—(1) The Director of Operational Test and Evaluation shall evaluate the results of each test conducted under subsection (a) as soon as practicable after the completion of such test. (2) The Director shall submit to the Secretary of Defense and the congressional defense committees a report on the evaluation of each test conducted under subsection (a) upon completion of the evaluation of such test under paragraph (1). (e) COST, SCHEDULE, AND PERFORMANCE BASELINES.—(1) The Director of the Missile Defense Agency shall establish cost, schedule, and performance baselines for each block configuration of the Bal listic Missile Defense System being fielded. The cost baseline for a block configuration shall include full life cycle costs for the block configuration. (2) The Director shall include the baselines established under paragraph (1) in the first Selected Acquisition Report for the Bal listic Missile Defense System that is submitted to Congress under section 2432 of title 10, United States Code, after the establishment of such baselines. (3) The Director shall also include in the Selected Acquisition Report submitted to Congress under paragraph (2) the significant assumptions used in determining the performance baseline under paragraph (1), including any assumptions regarding threat missile countermeasures and decoys. Reports. Deadline. Deadline. 10 USC 2431 note. Deadline.