Page:United States Statutes at Large Volume 119.djvu/1276

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

[119 STAT. 1258]
PUBLIC LAW 109-000—MMMM. DD, 2005
[119 STAT. 1258]

119 STAT. 1258

PUBLIC LAW 109–59—AUG. 10, 2005 Highway Projects High Priority Projects—Continued

No.

State 39 40 41 42 43

44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60

61 62

63 64

VerDate 14-DEC-2004

13:51 Oct 26, 2006

Jkt 039194

PO 00002

Project Description

VA

Final Design and Construction for improvements at I–64 and City Line Road, Virginia Beach and Chesapeake ................................... Replacement of Cross Street Bridge spanning flood prone Aberjona River, Winchester ........ Construction of and improvement to I–73, I– 74, and U.S. 220 in Montgomery and Randolph Counties, NC ......................................... Access and transportation enhancements to access Lake Belva Deer, Sigourney ............... Roadway surface improvements, street lighting, and storm drain improvements to South Center Street from Baughman Road to State Route 78/86, Westmorland ............................. Construct two connectors between SH 288 and Beltway 8 ......................................................... Implement Central NY highway grade crossing and grade separation project ................... Douglas St. Improvements, El Segundo ............ Reconstruction of Massachusetts Avenue including safety improvements and related pedestrian, bike way in Arlington ..................... Reconstruction of Rt. 5, 8, 12 (North South Arterial) Burrstone Rd. to Oriskany Circle, City of Utica ..................................................... Construction of Norman highway-rail Grade Separation ........................................................ Construction of the Montour Trail, Great Allegheny Passage ................................................. Route 1 San Pedro Creek Bridge replacement in Pacifica ........................................................ South Lyon, 2nd St. between Warren and Haggadorn ........................................................ Street improvements, Abington Township ........ Study of a direct link to I–80, Pella .................. Knoxville, TN Cessna Rd. Improving At-Grade highway-railroad Crossings ............................ Construct bike/pedestrian path, Powers ........... IL 29 from IL 6 to I–180—Phase 2 study and land acquisition ............................................... Construct a new bridge at Indian Street, Martin County ........................................................ Improve sidewalks, upgrade lighting, and add landscaping in downtown Glennville ............. Continue planning and construction of the New Orleans Regional Planning Commission Mississippi River trail in St. John, Plaquemines St. Bernard and St. Charles parishes ............................................................ Road widening and curb and gutter improvements on Hwy 33 in Kearney ......................... The SH 146, Port Rd. direct connectors allows traffic bypass several rail lines and traffic signals at, near intersection of SH 146 and Port Rd ............................................................. Reconstruct South Moore Cut-off Road in Emery County .................................................. Improvements to exits along Interstate 81 in Franklin County, PA—Antrim Road .............

MA NC IA CA

TX NY CA MA NY OK PA CA MI PA IA TN OR IL FL GA LA

MO TX

UT PA

Frm 00115

Fmt 6580

Sfmt 6581

E:\PUBLAW\PUBL002.119

Amount

APPS06

$800,000 $800,000 $8,800,000 $1,600,000

$640,000 $1,800,000 $1,600,000 $3,200,000 $1,600,000 $800,000 $1,600,000 $1,600,000 $2,500,000 $100,000 $1,600,000 $400,000 $76,800 $440,000 $1,600,000 $800,000 $400,000

$1,520,000 $2,400,000

$10,560,000 $7,500,000 $6,560,000

PsN: PUBL002