Page:United States Statutes at Large Volume 119.djvu/1312

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

[119 STAT. 1294]
PUBLIC LAW 109-000—MMMM. DD, 2005
[119 STAT. 1294]

119 STAT. 1294

PUBLIC LAW 109–59—AUG. 10, 2005 Highway Projects High Priority Projects—Continued

No. 966 967

968 969 970 971 972 973 974 975 976 977 978 979 980 981 982 983 984 985 986 987

988 989

990 991

VerDate 14-DEC-2004

13:51 Oct 26, 2006

Jkt 039194

PO 00002

State

Project Description

NY

Improve Route 17—Access Control, Elmira to Chemung .......................................................... Design, engineering, ROW acquisition, and construction of streetscaping enhancements, paving, lighting, safety improvements, parking, and roadway redesign in Plymouth Borough, Luzerne County ..................................... Improve SH 75 from Timmerman to Ketchum Improve U.S. 97 from Modoc Point to Algoma Construct an interchange on I–90 at Marion Road west of Sioux Falls ................................ Realign First St. between Mission Rd. and Clarence St. in Los Angeles ............................ Relocation of Route 13 Branson West Bypass .. Resurfacing Congress Parkway The Illinois Department of Transportation ....................... Establish interchange between Route 4 and Interstate 95 .................................................... Improvements to FM 676 in Alton .................... Reconstruction of Goddard Memorial Drive from State Route 9 to Airport Drive, Worcester ..................................................................... Homestead, FL Widening of SW 320 Street (Mowry Drive) from Flagler Avenue to SW 187 Avenue ...................................................... Broad Street Reconstruction Project in New Britain .............................................................. Construct Johnsonburg Bypass ......................... Construct Valley Service Road Extension, North Haven .................................................... Construction of transportation related enhancements and infrastructure of the VMFA project ............................................................... Reconstruct and Widen I–94 in Kalamazoo, MI Land Acquisition for Highway Mitigation in Cecil and Worcester Counties, MD ................ Construct overpass on Central Ave. at the railroad crossing in Newark ................................. City of Bartonville, Street widening and improvements and sidewalk improvements ...... Construct Williamsburg, Ohio to Batavia, Ohio Hike, and Bike Trail ....................................... The continuation of U.S. Route 12 from the Wisconsin State line to the intersection of Tryon Grove Road, Route 12 and Illinois State Route 31 ................................................. U.S. 17–92 and French Ave. Roundabout, Sanford ................................................................... Design, engineering, ROW acquisition, and construction of streetscaping enhancements, paving, lighting, safety improvements, parking, and roadway redesign in Hanover Township, Luzerne County ............................. Reduction from 3.5 miles of travel to 1.0 mile of travel crossing over the Tittabawassee River on Meridian Road .................................. Widen U.S. 95 from Top of Lewiston Hill to Moscow, Idaho .................................................

PA

ID OR SD CA MO IL RI TX MA FL CT PA CT VA MI MD CA IL OH IL

FL PA

MI ID

Frm 00151

Fmt 6580

Sfmt 6581

E:\PUBLAW\PUBL002.119

Amount

APPS06

$2,000,000

$160,000 $4,800,000 $1,600,000 $5,600,000 $1,000,000 $4,160,000 $400,000 $4,800,000 $400,000 $900,000 $2,000,000 $2,000,000 $3,520,000 $1,600,000 $800,000 $12,800,000 $15,600,000 $600,000 $762,058 $240,000

$2,400,000 $400,000

$160,000 $2,400,000 $1,600,000

PsN: PUBL002