Page:United States Statutes at Large Volume 119.djvu/1343

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

[119 STAT. 1325]
PUBLIC LAW 109-000—MMMM. DD, 2005
[119 STAT. 1325]

PUBLIC LAW 109–59—AUG. 10, 2005

119 STAT. 1325

Highway Projects High Priority Projects—Continued

No. 1761 1762 1763 1764 1765

1766 1767

1768 1769 1770 1771

1772 1773 1774 1775 1776 1777 1778 1779 1780 1781 1782 1783

VerDate 14-DEC-2004

13:51 Oct 26, 2006

State

Project Description

MA

Acquisition, engineering, design, and construction of the Assabet River Rail Trail, Acton, Hudson, Maynard, and Stow .......................... Conduct Feasibility Study to Extend I–475 to U.S. 23 in Genesee County ............................. Construct a reliever route on U.S. 287 South of Dumas to U.S. 287 North of Dumas .......... construct new exit on I–75 and connect U.S. 11, U.S. 411, and SR 30 .................................. Design, engineering, ROW acquisition and construction of street improvements, parking, safety enhancements and roadway redesign in Pittston ................................................ Dowlen Road Improvements for Beaumont, Texas ................................................................ Construct Hwy 101 bicycle-pedestrian project in Marin and Sonoma Counties from north of Atherton Ave. to south of Petaluma River bridge ................................................................ Construct raised median from Loop 224 to Sradley St. in Nacogdoches, TX ..................... Construction of bicycle trail extension in Geauga Park District in Chardon, OH .......... Extension of a regional Class I bikeway from the West City limits to the East City limits along leased railroad right-of-way ................. For rail grade separations identified by the MPO for the Little Rock/North Little Rock metropolitan area, (which may include: Edison Ave.; Springer Blvd.; Hwy 89 Extension; McCain/Fairfax; Salem Road; J.P. Wright Loop; South Loop; Geyer Springs Rd) ........... Court Street and Smith Street Shopping District Enhancements ......................................... Hampshire County Bike Paths, Design and Construction .................................................... Construct I–15 Starr Interchange ..................... Construct full-access interchange at SR 120— McKinley Avenue, with the necessary SR 120 auxiliary lanes, Manteca, CA .................. Install emergency vehicle preemption equipment along major arterials in the I–880 corridor, Alameda County .................................... Construct a proposed relocation of U.S. 22 and SR 93 from the current IR 70, U.S. 40 west of Zanesville ..................................................... Conduct Study and Construct I–205 Chrisman Road Interchange Project, Tracy, CA ............ Construction of part of a 230 mile corridor U.S. 67 near Jerseyville and Carrolton, Illinois ................................................................... Construction of Campus Parkway from State Route 99 to Yosemite Ave., Merced County .. Construction of Superior Road Roundabout, Superior Township .......................................... Construction and preliminary engineering of a railroad crossing at the intersection of Havlik Road and Hwy 30, Scappoose ............ Clark Road Clover Leaf at I–95, Jacksonville ..

MI TX TN PA

TX CA

TX OH CA AR

NY MA NV CA CA OH CA IL CA MI OR FL

Jkt 039194

PO 00002

Frm 00182

Fmt 6580

Sfmt 6581

Amount

$1,500,000 $480,000 $2,400,000 $3,600,000

$1,400,000 $2,764,800

$400,000 $2,680,000 $400,000 $320,000

$8,000,000 $640,000 $4,400,000 $8,000,000 $3,200,000 $400,000 $4,800,000 $800,000 $1,360,000 $400,000 $600,000 $198,400 $4,400,000

E:\PUBLAW\PUBL002.119

APPS06

PsN: PUBL002