Page:United States Statutes at Large Volume 119.djvu/1386

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

[119 STAT. 1368]
PUBLIC LAW 109-000—MMMM. DD, 2005
[119 STAT. 1368]

119 STAT. 1368

PUBLIC LAW 109–59—AUG. 10, 2005 Highway Projects High Priority Projects—Continued

No. 2862 2863 2864 2865

2866 2867 2868 2869 2870 2871 2872 2873 2874 2875 2876 2877 2878 2879 2880 2881 2882 2883 2884 2885 2886 2887 2888 2889 2890 2891

VerDate 14-DEC-2004

13:51 Oct 26, 2006

Jkt 039194

PO 00002

State

Project Description

VA

Cranesnest Trail—Construction of hiking, biking, horse trail from Route 83 to Cranesnest Campground ................................ Durham and Chatham Counties, NC Completion of American Tobacco Trail ...................... Austin to Manor Rail Trail, Texas .................... Eliminate existing rail line in Indian, PA to eliminate 37 at grade crossings and reconstruct the line outside the town from Glenn Lock to Middletown ......................................... Extend Cuyuna Range and Great River Road Trails, Aitkin ................................................... Conduct planning, engineering, and eventual construction of Rt. 5 in City of Oneida, from Seneca St. to county line ................................ Great Neck Road Traffic Calming Project ........ Design and construct new streetscape through Irvington Center .............................................. Construct connector road between Collinsville Rd. to IL 3/North 1st St, St. Clair County .... Carteret, NJ Ferry Service Terminal ................ Construct I–10/U.S. 231 Connector from Dothan, AL to Florida ..................................... Bicycle Paths for the Magic Mile in Willougby, OH .................................................................... Construct I–73/I–74 in Montgomery County and Richmond County, North Carolina ......... Construct Phase II I–90 Connector ITS Laboratory in Rensselaer County ......................... Design and Construction of the Airport Area Roadway Network, High Point ....................... Engineering and Construction of the Centennial Trail in Snohomish .................................. I–5 Beltline Interchange .................................... Extension North from Rt. 30 to Wheeler Road and Galena Boulevard extension west of Rt. 47 in Sugar Grove, IL ..................................... Newburgh, Improve East End Roads ................ Construction of the Kennebec River Rail Trail Construct Bristol Street multimodal corridor in Santa Ana .................................................... Construct pedestrian sidewalk enhancements in Bellflower ..................................................... Improvement and expansion for 2.7 miles of K18 in Geary County ...................................... I–110/SR 47/Harbor Blvd. Interchange Improvements, San Pedro ................................... Oxbow National Wildlife Refuge, Design and construction of a Visitor Contact Station ...... Pedestrian Improvements for Pell City, AL ..... Rehabilitate Highway 51 between CTH S and U.S. 8 in Lincoln County ................................ Rehabilitate tunnel and bridge on National Road Bikeway in St. Clairsville ..................... Pennington Ave. Drawbridge, Baltimore .......... Rehabilitation and paving of Parker River Road ..................................................................

NC TX PA

MN NY NY NJ IL NJ AL OH NC NY NC WA OR IL NY ME CA CA KS CA MA AL WI OH MD MA

Frm 00225

Fmt 6580

Sfmt 6581

E:\PUBLAW\PUBL002.119

Amount

APPS06

$520,000 $1,600,000 $1,600,000

$3,200,000 $320,000 $400,000 $320,000 $800,000 $4,800,000 $1,680,000 $2,400,000 $640,000 $14,400,000 $4,800,000 $2,240,000 $800,000 $20,000,000 $3,808,000 $1,490,800 $400,000 $2,800,000 $400,000 $11,600,000 $4,000,000 $1,500,000 $266,666 $1,600,000 $700,000 $800,000 $200,000

PsN: PUBL002