Page:United States Statutes at Large Volume 119.djvu/695

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

[119 STAT. 677]
PUBLIC LAW 109-000—MMMM. DD, 2005
[119 STAT. 677]

PUBLIC LAW 109–58—AUG. 8, 2005

119 STAT. 677

Commission’s Dispute Resolution Service. The Dispute Resolution Service shall consult with the Secretary and the Commission and issue a non-binding advisory within 90 days. The Secretary may accept the Dispute Resolution Service advisory unless the Secretary finds that the recommendation will not adequately protect the fish resources. The Secretary shall submit the advisory and the Secretary’s final written determination into the record of the Commission’s proceeding.’’.

Deadline.

SEC. 242. HYDROELECTRIC PRODUCTION INCENTIVES.

42 USC 15881.

(a) INCENTIVE PAYMENTS.—For electric energy generated and sold by a qualified hydroelectric facility during the incentive period, the Secretary shall make, subject to the availability of appropriations, incentive payments to the owner or operator of such facility. The amount of such payment made to any such owner or operator shall be as determined under subsection (e) of this section. Payments under this section may only be made upon receipt by the Secretary of an incentive payment application which establishes that the applicant is eligible to receive such payment and which satisfies such other requirements as the Secretary deems necessary. Such application shall be in such form, and shall be submitted at such time, as the Secretary shall establish. (b) DEFINITIONS.—For purposes of this section: (1) QUALIFIED HYDROELECTRIC FACILITY.—The term ‘‘qualified hydroelectric facility’’ means a turbine or other generating device owned or solely operated by a non-Federal entity which generates hydroelectric energy for sale and which is added to an existing dam or conduit. (2) EXISTING DAM OR CONDUIT.—The term ‘‘existing dam or conduit’’ means any dam or conduit the construction of which was completed before the date of the enactment of this section and which does not require any construction or enlargement of impoundment or diversion structures (other than repair or reconstruction) in connection with the installation of a turbine or other generating device. (3) CONDUIT.—The term ‘‘conduit’’ has the same meaning as when used in section 30(a)(2) of the Federal Power Act (16 U.S.C. 823a(a)(2)). The terms defined in this subsection shall apply without regard to the hydroelectric kilowatt capacity of the facility concerned, without regard to whether the facility uses a dam owned by a governmental or nongovernmental entity, and without regard to whether the facility begins operation on or after the date of the enactment of this section. (c) ELIGIBILITY WINDOW.—Payments may be made under this section only for electric energy generated from a qualified hydroelectric facility which begins operation during the period of 10 fiscal years beginning with the first full fiscal year occurring after the date of enactment of this subtitle. (d) INCENTIVE PERIOD.—A qualified hydroelectric facility may receive payments under this section for a period of 10 fiscal years (referred to in this section as the ‘‘incentive period’’). Such period shall begin with the fiscal year in which electric energy generated from the facility is first eligible for such payments. (e) AMOUNT OF PAYMENT.— (1) IN GENERAL.—Payments made by the Secretary under this section to the owner or operator of a qualified hydroelectric

VerDate 14-DEC-2004

08:19 Oct 26, 2006

Jkt 039194

PO 00001

Frm 00675

Fmt 6580

Sfmt 6581

E:\PUBLAW\PUBL001.119

Records.

Applicability.

APPS06

PsN: PUBL001