Page:United States Statutes at Large Volume 121.djvu/1231

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.
[121 STAT. 1210]
PUBLIC LAW 110-000—MMMM. DD, 2007
[121 STAT. 1210]

121 STAT. 1210

PUBLIC LAW 110–114—NOV. 8, 2007

(1) IN GENERAL.—In furtherance of the goals of the agreement described in subsection (a)(2), the Secretary shall participate in the planning, design, and construction of projects and pilot projects on the Kings River and its tributaries to enhance aquatic habitat and water availability for fisheries purposes (including maintenance of a trout fishery) in accordance with flood control operations, water rights, and beneficial uses in existence as of the date of enactment of this Act. (2) PROJECTS.—Projects referred to in paragraph (1) may include— (A) projects to construct or improve pumping, conveyance, and storage facilities to enhance water transfers; and (B) projects to carry out water exchanges and create opportunities to use floodwater within and downstream of Pine Flat Reservoir. (c) NO AUTHORIZATION OF CERTAIN DAM-RELATED PROJECTS.— Nothing in this section shall be construed to authorize any project for the raising of Pine Flat Dam or the construction of a multilevel intake structure at Pine Flat Dam. (d) USE OF EXISTING STUDIES.—In carrying out this section, the Secretary shall use, to the maximum extent practicable, studies in existence on the date of enactment of this Act, including data and environmental documentation in the document entitled ‘‘Final Feasibility Report and Report of the Chief of Engineers for Pine Flat Dam Fish and Wildlife Habitat Restoration’’ and dated July 19, 2002. (e) CREDIT FOR LAND, EASEMENTS, AND RIGHTS-OF-WAY.—The Secretary shall credit toward the non-Federal share of the cost of construction of any project under subsection (b) the value, regardless of the date of acquisition, of any land, easements, rightsof-way, dredged material disposal areas, or relocations provided by the non-Federal interest for use in carrying out the project. (f) OPERATION AND MAINTENANCE.—The operation, maintenance, repair, rehabilitation, and replacement of projects carried out under this section shall be a non-Federal responsibility. (g) AUTHORIZATION OF APPROPRIATIONS.—There is authorized to be appropriated to carry out this section $20,000,000. Such sums shall remain available until expended. SEC. 5050. RAYMOND BASIN, SIX BASINS, CHINO BASIN, AND SAN GABRIEL BASIN, CALIFORNIA.

(a) COMPREHENSIVE PLAN.—The Secretary, in consultation and coordination with appropriate Federal, State, and local entities, shall develop a comprehensive plan for the management of water resources in the Raymond Basin, Six Basins, Chino Basin, and San Gabriel Basin, California. The Secretary may carry out activities identified in the comprehensive plan to demonstrate practicable alternatives for water resources management. (b) OPERATION AND MAINTENANCE.—The non-Federal share of the cost of operation and maintenance of any measures constructed under this section shall be 100 percent. (c) AUTHORIZATION OF APPROPRIATIONS.—There is authorized to be appropriated to carry out this section $5,000,000. SEC. 5051. SAN FRANCISCO, CALIFORNIA.

dkrause on GSDDPC44 with PUBLAW

(a) IN GENERAL.—The Secretary, in cooperation with the Port of San Francisco, California, may carry out the project for repair

VerDate Aug 31 2005

13:52 Jan 23, 2009

Jkt 059194

PO 00001

Frm 01208

Fmt 6580

Sfmt 6581

M:\STATUTES\2007\59194PT1.001

APPS10

PsN: 59194PT1