PUBLIC LAW 110–140—DEC. 19, 2007
121 STAT. 1621
dkrause on GSDDPC44 with PUBLAW
pump technology standards that could be used for all types of GSA facilities. (2) REPLACEMENT.— (A) IN GENERAL.—As part of the program under this section, not later than 180 days after the date of enactment of this Act, the Administrator shall establish, using available appropriations and programs implementing sections 432 and 525 (and amendments made by those sections), a cost-effective lighting technology and geothermal heat pump technology acceleration program to achieve maximum feasible replacement of existing lighting, heating, cooling technologies with cost-effective lighting technologies and geothermal heat pump technologies in each GSA facility. Such program shall fully comply with the requirements of sections 321 through 324, 431 through 438, 461, 511 through 518, and 523 through 525 and amendments made by those sections and any other provisions of law, which shall be applicable to the extent that they are more stringent or would achieve greater energy savings than required by this section. (B) ACCELERATION PLAN TIMETABLE.— (i) IN GENERAL.—To implement the program established under subparagraph (A), not later than 1 year after the date of enactment of this Act, the Administrator shall establish a timetable of actions to comply with the requirements of this section and sections 431 through 435, whichever achieves greater energy savings most expeditiously, including milestones for specific activities needed to replace existing lighting, heating, cooling technologies with cost-effective lighting technologies and geothermal heat pump technologies, to the maximum extent feasible (including at the maximum rate feasible), at each GSA facility. (ii) GOAL.—The goal of the timetable under clause (i) shall be to complete, using available appropriations and programs implementing sections 431 through 435 (and amendments made by those sections), maximum feasible replacement of existing lighting, heating, and cooling technologies with cost-effective lighting technologies and geothermal heat pump technologies consistent with the requirements of this section and sections 431 through 435, whichever achieves greater energy savings most expeditiously. Notwithstanding any provision of this section, such program shall fully comply with the requirements of the Act including sections 321 through 324, 431 through 438, 461, 511 through 518, and 523 through 525 and amendments made by those sections and other provisions of law, which shall be applicable to the extent that they are more stringent or would achieve greater energy or water savings than required by this section. (d) GSA FACILITY TECHNOLOGIES AND PRACTICES.— (1) IN GENERAL.—Not later than 180 days after the date of enactment of this Act, and annually thereafter, the Administrator shall— (A) ensure that a manager responsible for implementing section 432 and for accelerating the use of cost-
VerDate Aug 31 2005
07:12 Jan 26, 2009
Jkt 059194
PO 00002
Frm 00329
Fmt 6580
Sfmt 6581
Deadline.
Deadline.
Deadline.
M:\STATUTES\2007\59194PT2.001
APPS10
PsN: 59194PT2
�