Page:United States Statutes at Large Volume 121.djvu/1969

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.
[121 STAT. 1948]
PUBLIC LAW 110-000—MMMM. DD, 2007
[121 STAT. 1948]

121 STAT. 1948

Deadline.

Deadline.

120 Stat. 454.

Deadlines.

dkrause on GSDDPC44 with PUBLAW

Notification.

VerDate Aug 31 2005

07:12 Jan 26, 2009

PUBLIC LAW 110–161—DEC. 26, 2007

(3) the facility at which the wastes are generated is located in the same watershed as the landfill. (b) DEFINITIONS.—For purposes of this section: (1) The term ‘‘affiliated person’’ means any person who, directly or indirectly, owns or controls the waste generator, is owned or controlled by the waste generator, or is under common ownership or control with the waste generator. (2) The term ‘‘Muskingum River watershed’’ shall mean the area within the watershed of the Muskingum River, as delineated by the Secretary of the Army, acting through the Chief of Engineers. SEC. 133. CONVEYANCE TO STORY COUNTY, IOWA. Not later than 180 days after the date of enactment of this Act, the Chief of the Army Corps of Engineers shall convey to Story County, Iowa, without consideration, all rights, title, and interest of the United States in and to a parcel of real property, including any improvements thereon, consisting of approximately 197 acres originally proposed for the Skunk River Reservoir, located between Ames, Iowa, and Story City, Iowa. SEC. 134. None of the funds provided herein may be used to implement any new water control manuals for the ApalachicolaChattahootchee-Flint and Alabama-Coosa-Tallapoosa river systems: Provided, That in updating the water control manuals the Secretary of the Army, acting through the Chief of Engineers is directed to provide the following information by September 30, 2008: (1) an estimate of the amount of withdrawals from each respective river basin for entities withdrawing one million gallons per day or more over the preceding 60 months; (2) a flow data set for the respective river basin updated through the most recently completed calendar year; and (3) an estimated projection of total water usage in the respective basins over the next 25 years. SEC. 135. Title II, chapter 3 of Public Law 109–234 under the heading ‘‘Construction’’ is modified by striking ‘‘construction: Provided,’’ and inserting in lieu thereof ‘‘: Provided, That the Secretary of the Army, in implementing projects and measures in the New Orleans metropolitan area required to achieve certification for participation in the National Flood Insurance Program as directed in Public Law 109–234 shall include all authorized features of the Southeast Louisiana Flood Control project and related internal pumping requirements as integral elements of the comprehensive protection system for the area and shall complete all authorized work for the Southeast Louisiana project concurrently and integrally with other area projects: Provided further,’’. SEC. 136. Utilizing funds appropriated under Alaska Coastal Erosion or other available funds, the Secretary of the Army, acting through the Chief of Engineers, is directed to prepare a preliminary action plan for any community that requests assistance pursuant to section 117, as contained in title I, division C of Public Law 108–447: Provided, That the preliminary action plan pursuant to this authority shall be presented to the Assistant Secretary of the Army (Civil Works) and the Alaska Congressional Delegation not later than 90 days after the initial request from the community: Provided further, That the preliminary action plan will recommend the most appropriate course of action (relocation or erosion stabilization), including a preliminary cost estimate and, at a minimum, the first year funding requirements: Provided further, That if the

Jkt 059194

PO 00002

Frm 00656

Fmt 6580

Sfmt 6581

M:\STATUTES\2007\59194PT2.001

APPS10

PsN: 59194PT2