Page:United States Statutes at Large Volume 45 Part 1.djvu/1924

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

INDEX. clxxiii Mitai"ippi Riller-Continued. project ofJ)lan recommended by Chief of Enginee1'8 for flood control of, and improvement from Head of Passes to Cape Girardeau, paill./ Mitaillippi Rwer and TributatWc, Flood Control--Continued. assurances required ofStates,etc.: main- tain control works after comple- adopted ____________________ _ board to carry on, created________ _ comP<>Sition of, and duties ______ _ executIon by Missil!8ippi River Com- 534 534 534 ~ion______________________ 535 sum authorized for________________ 535 unexpended balances for flood con- trol on, available___ ___________ 535 provisions for water transportation . facilities by barges, etc., on and tributaries _____________ ih8-981 time extended for bridging, at Arkansas City,Ark____________________ 1511 at Baton Roug«l, La_______________ 1093 at Bettendorf, Iowa_______________ 1512 atCairo, IlL__ .. __________________ 1557 at Carondelet, Mo________________ 1308 at Chester, Ill____________________ 1529 at Clearwater, Minn___________ 118, 1527 at Helena, Ark___________________ 1529 at Hickman, Ky__________________ 1532 at Natchez, Miss ___ ._ __ __ __ __ __ __ 1094 at New Orleans, La _____________ 193,732 between New Orleans and Gretna, La__________________________ 1229 at QuincyI...IlL ___ __ ___ __ · _________ 296 at Saint raul and Minneapolis, Minn_____________________ 293,1185 at Savanna, Ill ________________ 297,1158 at Tiptonville, Tenn______________ 1451 at Vicksburg, Miss________________ 1446 Mi8si88ippi Riller and Tributari68, Flood Control, project of plan submitted by Chief of Engmee1'8 for flood control of the Mississippi, and improvement from Head of Passes to Cape Girardeau, adopted____________ 534 board to carry on the project created: compensation, etc_____________ 534 to consider engineering differences between the project and plans ~mmend~ . by Mississippi River-COmDl1SS10n_ ___________ 535 decisions . of President on recom- mendations of, to be followed___ 535 limit on power of. _ _______________ 535 project t:o be exec~te~ by Mississippi River COmDllSSlOn____________ 535 board to have surve~s made between Baton Rouge, La., and Cape Gi- rardeau, before undertaking flood control other than levees, etc___ 535 protection of adjacent lands by diver- sion works and outlets_________ 535 areas within floodways, etc., pending completion___________ ____ _____ 535 no postponement, etc., with executing project on east side of the river_ 535 unexpendea balances for Mississippi River flood control made avail- able________ _____ ____ ___ ______ 535 local contribution toward cost of flood control declared ~ sound prin- ciple_ _________ __ ___ ___ ______ 535 considerations for not requiring, for adopted project_ _____________ 535 assurances required of States, etc., be- fore expenditure on any con- struction item or project_______ 535 tion ________________________ _ accept flowage lands turned over to them_______________________ _ provide rights of way for levee foun- dation, Cape Girardeau to Head of Passes____________________ _ no FJlderal liability for flood damage8_ land"'or flowage rights where levees not practicable, and lands subject to . overflow, now protected by levees on opposite bank, to be acquired ____________________ _ flowage rights to be provided for addi- tional flood wate1'8 caused by di- verting main channeL________ '- resulting benefits to be considered__ _ condemnation in district coutts for . lands needed for project ______ _ assessment of value ______________ _ purchase from owner fixing a reason- able price___________________ _ donations accepted_______________ _ procedure provisions_____________ _ acquired land given to ownel'8hip of States,etc __________________ _ mapping agencies of the Government to assist in preparing necessary maps________________ ,. _______ _ application of fundA for works not in- cluded in present project______ _ levee work between ROck Island and Cape Girardeau______________ _ on outlets and tributaries, Rock Island to Head of Passes _____ _ StatA:,sl etc.; to provide rights of wayI 3iS~ per cent of cost of workJ..ana maintenance of, between .H.OCk Island and Cape Girardeau____ _ expenditures limited to $10,000,000__ in an emergency, funds for mainte- nance of a levee, if State, etc., unable to do BO ______________ _ emergen('J' fund authorized, in rescue work, etc., on tributaries threat- ened, etc., by flood, including flood of 1927 ________________ _ Mississippi River COmmil!8ion to prose- cute the project______________ _ inspection trips to be made by, to ac- quire information of conditions and flood-control 1?roblems, etc_ title, rank, etc., of pre&ldent as exec- utive officer _________________ _ appointment of present president as brigadier general of the Army __ salaries: deduction of official salary from amount fixed herewith___ _ application of n8.vipble wate1'8 restric- tions1 penaltIes, etc., to property acquired,etc________________ _ surveys previously authorized of the Mississippi and tributaries to be speedily prosecuted __________ _ projects for flood control on all tribu- tary streams of the Mil!8issippL Red River and tributaries__________ _ Yazoo River and tributaries_______ _ White River and tributaries_______ _ Arkansas River and tributaries____ _ Ohio River and tributaries________ _ Missouri River and tributaries______ _ 635 636 536 636 536 536 536 536 536 536 536 536 536 536 537 537 537 537 537 537 537 537 537 537 537 537 537 538 538 538 538 538 538 538 538