Page:United States Statutes at Large Volume 58 Part 1.djvu/534

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

PUBLIC LAWS-CH. 300-JUNE 28,1944 Total; acountig. Purchase of school, etc., sites. Pw, p.s 88 Poe, p. 80. to be constructed, at a total cost of not to exceed $250,000, on a site at the Logan School, $7,500; For the preparation of plans and specifications for an eight-room extensible elementary school building to be constructed, at a total cost of not to exceed $200,000, on a site in the vicinity of Stanton Road and Bruce Place Southeast, $6,000; For the preparation of plans and specifications for an addition to the Taft Junior High School, consisting of two wings with five rooms in each, two gymnasiums, and a sloping floor in the auditorium to be constructed at a total cost of not to exceed $207,000, $6,210; For the preparation of plans and specifications for a fifteen-room junior high school addition on the second and third floors of the Ban- neker Junior High School, to be constructed at a total cost of not to exceed $175,000, $5,250; For the preparation of plans and specifications for a twenty-four- room elementary school building, including an assembly hall-gymna- sium to be constructed, at a total cost of not to exceed $500,000, on a site in the vicinity of the recreation center at Nichols Avenue and Sumner Road Southeast, to replace the present Birney School, $15,000; For the preparation of plans and specifications for a junior high school building to be constructed, at a total cost of not to exceed $980,000, on a site in the vicinity of Ninth and C Streets Southeast, to replace the present Hine Junior High School, $29,400; For the preparation of plans and specifications for a sixteen-room elementary school building, including an assembly hall-gymnasium to be constructed, at a total cost of not to exceed $357,350, on a site in the vicinity of New Jersey Avenue and P Street Northwest, to replace the present Morse and Twining Schools, $10,720; For the completion of plans and specifications for the Spingarn Senior High School to be constructed on the site already owned by the District of Columbia at Twenty-fourth Street and Benning Road Northeast, $6,594, and the limit of cost of said building is increased to $1,344,000, including a third floor, two gymnasiums, and treatment of grounds; The limit of cost of the new extensible vocational school to replace the present Abbot Vocational School, to be located in Brentwood Park, is hereby increased to $823,500, including an assembly hall-gymnasium, building space for recreation purposes, all necessary approach work, and treatment of grounds; In all, $92,674, to be immediately available as one fund and to remain available until expended, which amount may be credited to the appro- priation account, "Office of Municipal Architect, construction serv- ices", to be disbursed and accounted for as "Capital outlay, public schools". For the purchase of school building and playground sites as follows: In the vicinity of Third and L Streets Northwest, for the construc- tion of a twenty-four-room elementary school building, including an assembly hall-gymnasium, for the replacement of the present Walker and Jones Schools; In the vicinity of Fifteenth and Hamlin Streets Northeast, for the construction of an eight-room extensible elementary school building, and for physical education purposes; In the vicinity of Fifty-third and Drake Streets Southeast, for the construction of a sixteen-room elementary school building, including an assembly hall-gymnasium; In the vicinity of the Peabody School to provide sufficient land for the construction of a sixteen-room elementary school building, includ- ing an assembly hall-gmnasium, for the replacement of the present Peabody, Hilton, and Carbery Schools; [58 STAT.