Page:United States Statutes at Large Volume 62 Part 1.djvu/1208

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

PUBLIC LAWS-- H . 771-JUNE 30, 1948 Batavia, N. Y. Dansville, N. Y . Red Run, Mich. Reno Beach- Howards Farm, Ohio. Tucson, Arlz. 62 Stat. 1222 . Detroit Reservoir. 45 Stat. 534 . 33U.S.C.§§702a- 702m, 704. Cape Girardean. Miners Bend and vicinity, South Dakota and Nebraska, in accordance with plans on file in the office of the Chief of Engineers at an estimated cost of $3,000,000. GREAT LAKES BASIN The project for flood protection at Batavia and vicinity, New York, on Tonawanda Creek is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in Senate Docu- ment Numbered 46, Eightieth Congress, at an estimated cost of $565,000. The project for flood protection at Dansville and vicinity, New York, on Canaseraga Creek, a tributary of the Genesee River, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 206, Eightieth Congress, at an estimated cost of $165,000. The project for flood protection and other purposes on Red Run, a tributary of the Clinton River, Michigan, is hereby authorized sub- stantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 628, Eightieth Congress, at an estimated cost of $1,010,000. The project for protection of the Reno Beach-Howards Farm area and adjacent areas, Lucas County, Ohio, from floods caused by frequent windstorms and from increases in the lake level of Lake Erie, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 554, Eightieth Congress, at an estimated cost of $330,000. SANTA CLARA RIVER BASIN The project for flood protection along the Santa Clara River and its tributaries, California, is hereby authorized substantially in accord- ance with the recommendations of the Chief of Engineers in House Document Numbered 443, Eightieth Congress, at an estimated cost of $4,960,000. GILA RIVER BASIN The project for flood protection at Tucson and vicinity, Arizona, in the Gila River Basin, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Docu- ment Numbered 274, Eightieth Congress, at an estimated cost of $2,390,000. WILLAMETTE RIVE BASIN The general comprehensive plan for flood control, navigation, and other purposes approved by the Flood Control Act of June 28, 1938, is hereby modified to provide for the installation of hydroelectric power generating facilities, including the construction of a reregu- lating dam, at Detroit Reservoir on the North Santiam River in accordance with plans on file in the office of the Chief of Engineers. LOWER MIISSISSPPI RIVER The project for flood control and improvement of the Lower Mississippi River, adopted by the Act approved May 15, 1928 as amended by subsequent Acts, is hereby modified and expanded to include the following items: (a) The project for improvement of the Mississippi River below Cape Girardeau with respect to the West Tennessee tributaries at an estmated cost of $7,700,000, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 627 Eightieth Congress, and the authori- zation for the Lower Mississippi River project is increased accordingly. 1178 [62 STAT.