Page:United States Statutes at Large Volume 68 Part 1.djvu/1283

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.
[68 Stat. 1251]
PUBLIC LAW 000—MMMM. DD, 1954
[68 Stat. 1251]

68 S T A T. ]

1251

PUBLIC LAW 780-SEPT. 3, 1954

Hillsboro River, Florida: House Document Numbered 567, Eightyfirst Congress, at an estimated cost of $16,600; Carrabelle Harbor, Florida: House Document Numbered 451, Eighty-third Congress (maintenance of existing channel); Apalachicola Bay, Florida: House Document Numbered 156, Eighty-second Congress, at an estimated cost of $98,000; Apalachicola Bay, Florida, channel across St. George Island: House Document Numbered 557, Eighty-second Congress, at an estimated cost of $635,700; St. Joseph Bay, Florida: House Document Numbered 595, Eightyfirst Congress, at an estimated cost of $1,312,000; Mobile Harbor, Alabama: House Document Numbered 74, Eightythird Congress, at an estimated cost of $5,778,000; Dauphin Island Bay, Alabama: House Document Numbered 394, Eighty-second Congress, at an estimated cost of $70,000; Pascagoula Harbor, Mississippi: Modification of existing project in accordance with plans on file in the Office of the Chief of Engineers, at an estimated cost of $877,000; Bayou Segnette Waterway, Louisiana: House Document Numbered 413, Eighty-third Congress, at an estimated cost of $520,000; Sabine-Neches Waterway, Texas: Senate Document Numbered 80, Eighty-third Congress, at an estimated cost of $6,875,000; Guadalupe Kiver at Seadrift, Texas: House Document Numbered 478, Eighty-first Congress, at an estimated cost of $74,300; Aransas Pass, Texas, in connection with the Gulf Intracoastal Waterway: House Document Numbered 376, Eighty-third Congress, at an estimated cost of $30,700; Turtle Cove, Texas: House Document Numbered 654, Eighty-first Congress, at an estimated cost of $40,000; Port Aransas-Corpus Christi Waterway, Texas: House Document Numbered 89, Eighty-third Congress, at an estimated cost of $829,100: Provided, That work already performed by local interests on this project, in accordance with recommended plan, may be credited to the cash contribution required of local interests; Port Aransas-Corpus Christi Waterway, Texas: House Document Numbered 487, Eighty-third Congress, at an estimated cost of $180,000; Mississippi River at Louisiana, Missouri: House Document Numbered 251, Eighty-second Congress, at an estimated cost of $82,600; Mississippi River at Chester, Illinois: House Document Numbered 230, Eighty-third Congress, at an estimated cost of $65,000; Crooked Slough Harbor, Winona, Minnesota: House Document Numbered 347, Eighty-third Congress, at an estimated cost of $142,000; Cumberland River, Kentucky and Tennessee: Senate Document Numbered 81, Eighty-third Congress; and a monetary authorization not to exceed the estimated cost of the Dover and Eureka dams as described in House Document Numbered 761, Seventy-ninth Congress, "Cumberland River and its tributaries, Tennessee and Kentucky", authorized by the River and Harbor Act of July 24, 1946, is hereby authorized to be expended for partial accomplishment of the project hereby approved: Provided, That such authorization shall include the acquisition of lands necessary for wildlife purposes as outlined in said Senate Document Numbered 81; Green and Barren Rivers, Kentucky: Senate Document Numbered 82, Eighty-third Congress, at an estimated cost of $3,434,000 for channel dredging and fender system work; Knife River Harbor, Minnesota: House Document Numbered 463, Eighty-third Congress, at an additional estimated cost of $219,900;

Alabama.

Mississippi.

Louisiana. Texas.

Missouri. Illinois. Minnesota.

K e n t u c k y and Tennessee.

60 Stat. 636.

Kentucky.

Minnesota.