Page:United States Statutes at Large Volume 72 Part 1.djvu/348

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.
[72 Stat. 306]
PUBLIC LAW 85-000—MMMM. DD, 1958
[72 Stat. 306]

306

PUBLIC LAW 85-500-JULY 3, 1958

[72 S T A T.

lieu of the local cooperation recommended in the report of the Chief of Engineers in Senate Document Numbered 59, Eighty-fifth Congress, local interests (a) contribute 30 per centum of the first cost of the project, said 30 per centum being presently estimated at $5,160,000, including the value of lands, easements, and rights-of-way; (b) contribute the capitalized value of annual maintenance and operation for the main harbor barrier presently estimated at $1,560,000; (c) hold and save the United States free from damages due to the construction works; and (d) maintain and operate all the works except the main harbor barrier after completion in accordance with regulations prescribed by the Secretary of the Army. NARRAGANSETT BAY AREA, RHODE I S L A N D AND MASSACHUSETTS

Appropriation. 52 Stat. 1215.

The project for hurricane-flood protection in the Narragansett Bay area, Rhode Island and Massachusetts, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 230, Eighty-fifth Congress, at an estimated Federal cost of $11,550,000: Provided, That in lieu of the local cooperation recommended in the report of the Chief of Engineers in House Document Numbered 230, Eighty-fifth Congress, local interests (a) contribute 30 per centum of the first cost of the project, said 30 per centum being presently estimated at $4,950,000, including the value of lands, easements, and rights-of-way; (b) hold and save the United States free from damages due to the construction works; and (c) maintain and operate the improvements after completion in accordance with regulations prescribed by the Secretary of the Army. In addition to previous authorizations, there is hereby authorized to be appropriated the sum of $24,000,000 for the prosecution of the comprehensive plan for the Connecticut River Basin, approved in the Act of Juue 28, 1938, as amended and supplemented by subsequent Acts of Congress, and such comprehensive plan is hereby modified to include the construction of the Littleville Reservoir on the Middle Branch of Westfield River, Massachusetts, substantially in accordance with the recommendations of the Chief of Engineers in Senate Document Numbered 17, Eighty-fifth Congress, at an estimated cost of $5,090,000. The project for the Mad River Dam and Reservoir on the Mad River above Winsted, Connecticut, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 137, Eighty-fifth Congress, at an estimated cost of $5,430,000. H O U S A TO N I C RIVER B A S I N

The project for the flood control dam and reservoir on Hall Meadow Brook in Torrington and Goshen, Connecticut, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 81, Eighty-fifth Congress, at an estimated cost of $1,960,000. The project for the flood control dam and reservoir on the East Branch of the Naugatuck River in Torrington, Connecticut, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 81, Eighty-fiftli Congress, at an estimated cost of $1,780,000, S U S Q U E H A N N A RIVER B A S I N

The project for flood protection on the North Branch of the Susquehanna River, New York and Pennsylvania, is hereby authorized substantially in accordance with the recommendations of the Chief of