Page:United States Statutes at Large Volume 86.djvu/883

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

[86 STAT. 841]
PUBLIC LAW 92-000—MMMM. DD, 1972
[86 STAT. 841]

86 STAT. ]

PUBLIC LAW 92-500-OCT. 18, 1972

841

poses; the necessary waste water collection and urban storm water runoff systems; and a program to provide the necessary financial arrangements for the development of such treatment works; " (B) the establishment of construction priorities for such treatment works and time schedules for the initiation and completion of all treatment works; " (C) the establishment of a regulatory program to— " (i) implement the waste treatment management requirements of section 201(c), "(ii) regulate the location, modification, and construction of any facilities within such area which may result in any discharge in such area, and "(iii) assure that any industrial or commercial wastes discharged into any treatment works in such area meet applicable pretreatment requirements; " (D) the identification of thos4 agencies necessary to construct, operate, and maintain all facilities required by the plan and otherwise to carry out the plan; " (E) the identification of the measures necessary to carry out the plan (including financing), the period of time necessary to carry out the plan, the costs of carrying out the plan within such time, and the economic, social, and environmental impact of carrying out the plan within such time; " (F) a process to (i) identify, if appropriate, agriculturally and silviculturally related nonpoint sources of pollution, including runoff from manure disposal areas, and from land used for livestock and crop production, and (ii) set forth procedures and methods (including land use requirements) to control to the extent feasible such sources; " (G) a process to (i) identify, if appropriate, mine-related sources of pollution including new, current, and abandoned surface and underground mine runoff, and (ii) set forth procedures and methods (including land use requirements) to control to the extent feasible such sources j " (H) a process to (i) identify construction activity related sources of pollution, and (ii) set forth procedures and methods (including land use requirements) to control to the extent feasible such sources; " (I) a process to (i) identify, if appropriate, salt water intrusion into rivers, lakes, and estuaries resulting from reduction of fresh water flow from any cause, including irrigation, obstruction, ground water extraction, and diversion, and (ii) set forth procedures and methods to control such intrusion to the extent feasible where such procedures and methods are otherwise a part of the waste treatment management plan; " (J) a process to control the disposition of all residual waste generated in such area which could affect water quality; and -•" " (K) a process to control the disposal of pollutants on land or in subsurface excavations within such area to protect ground and surface water quality. " (3) Area wide waste treatment management plans shall be certified Annual certifiannually by the Governor or his designee (or Governors or their des- "^^^ °"' ignees, where more than one State is involved) as being consistent with applicable basin plans and such areawide waste treatment management plans shall be submitted to the Administrator for his approval. "(4) Whenever the Governor of any State determines (and notifies the Administrator) that consistency with a statewide regulatory program under section 303 so requires, the requirements of clauses (F) ^°* P- 846.