Page:United States Statutes at Large Volume 88 Part 1.djvu/161

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

[88 STAT. 117]
PUBLIC LAW 93-000—MMMM. DD, 1975
[88 STAT. 117]

88 STAT. ] (6)

PUBLIC LAW 93-276-MAY 10, 1974

117

PHYSICAL RESEARCH.—

Project 75-6-a, accelerator and reactor improvements and modifications, $3,000,000. Project 75-6-b, heavy ion research facilities, various locations, $19,200,000. Project 75-6-c, positron-electron joint project, Lawrence Berkeley Laboratory and Stanford Linear Accelerator Center, $900,000. (7)

BIOMEDICAL AND ENVIRONMENTAL RESEARCH AND SAFETY.—

Project 75-7-a, upgrading of laboratory facilities. Oak Ridge National Laboratory, Tennessee, $2,100,000. Project 75-7-b, environmental research laboratory. Savannah River, South Carolina, $2,000,000. Project 75-7-c, intermediate-level waste management facilities, Oak Ridge National Laboratory, Tennessee, $9,500,000. Project 75-7-d, modifications and additions to biomedical and environmental research facilities, $2,850,000. (8)

BIOMEDICAL AND ENVIRONMENTAL RESEARCH AND SAFETY.—

Project 75-8-a, environmental sciences laboratory. Oak Ridge National Laboratory, Tennessee, $8,800,000. (9) GENERAL PLANT PROJECTS.—$55,650,000. (10) CONSTRUCTION PLANNING AND DESIGN.—$2,000,000. (11) CAPITAL EQUIPMENT.—Acquisition and fabrication of capital

,:

-•.

equipment not related to construction, $208,850,000. (12)

REACTOR SAFETY RESEARCH.—

Project 75-12-a, reactor safety facilities modifications, $1,000,000. (13)

APPLIED ENERGY TECHNOLOGY.—

Project 75-13-a, hydrothermal pilot plant, $1,000,000. SEC. 102. LIMITATIONS.—(a) The Commission is authorized to start any project set forth in subsection 101(b)(1), (3), (5), (6), (7), (12), and (13) only if the currently estimated cost of that project does not exceed by more than 25 per centum the estimated cost set forth for that project. (b) The Commission is authorized to start any project set forth in subsection 101(b)(2), (4), (8), and (10) only if the currently estimated cost of that project does not exceed by more than 10 per centum the estimated cost set forth for that project. (c) The Commission is authorized to start any project under subsection 101(b)(9) only if it is in accordance with the following: (1) The maximum currently estimated cost of any project shall be $500,000 and the maximum currently estimated cost of any building included in such project shall be $100,000: Provided, That the building cost limitation may be exceeded if the Commission determines that it is necessary in the interest of efficiency and economy. (2) The total cost of all projects undertaken under subsection 101(b)(9) shall not exceed the estimated cost set forth in that subsection by more than 10 per centum. (d) The total cost of any project undertaken under subsection 101(b)(1), (3), (5), (6), (7), (12), and (13) shall not exceed the estimated cost set forth for that project by more than 25 per centum, unless and until additional appropriations are authorized under section 261 of the Atomic Energy Act of 1954, as amended, provided that this subsection will not apply to any project with an estimated cost less than $5,000,000.

-194 O - 76 - 11 Pt. 1

42 USC 2017.