Page:United States Statutes at Large Volume 90 Part 1.djvu/257

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

PUBLIC LAW 94-000—MMMM. DD, 1976

PUBLIC LAW 94-228—MAR. 11, 1976

90 STAT. 207

SEC. 203. The interest rate used for purposes of computing interest Interest rate during construction and interest on the unpaid balance of the capital costs allocated to interest-bearing features of the works authorized herein shall be determined by the Secretary of the Treasury, as of the beginning of the fiscal year in which construction is initiated, on the basis of the computed average interest rate payable by the Treasury upon its outstanding marketable public obligations, which are neither due nor callable for redemption for fifteen years from date of issue. SEC. 204. There is hereby authorized to be appropriated for con- Appropriation struction of works authorized by this title the sum of $4,000,000 authorization. (January 1975 price levels) plus or minus such amounts as may be justified by reason of ordinary fluctuations in construction costs as indicated by engineering cost indexes applicable to the types of construction involved herein. TITLE III MC KAY DAM AND RESERVOIR, OREGON

SEC. 301. McKay Dam and Reservoir, Umatilla project, Oregon, is hereby reauthorized for the purposes of irrigation, flood control, fish and wildlife, recreation, and safety of dams, and the costs thereof shall be reallocated among these purposes by the Secretary of the Interior (hereinafter referred to as the "Secretary"), in a manner consistent with the provisions of this title. SEC. 302, The Secretary is authorized to perform modifications to the spillway structure at McKay Dam as he determines to be reasonably required for safety of the dam from failure due to overtopping by potential flood inflows to the reservoir. SEC. 303. Not to exceed six thousand acre-feet of storage capacity in McKay Reservoir shall be allocated for the primary purpose of retaining and regulating flood flows. SEC. 304. Costs incurred in the modification of McKay Dam to insure its safety from failure shall be nonreimbursable and nonreturnable. All other costs of McKay Dam and Reservoir, her-etofore or hereinafter incurred, shall be allocated among the authorized purposes served by the dam and reservoir in accordance with standard cost allocation procedures, and the joint costs allocated to flood control, recreation, and fish and wildlife shall be nonreimbursable. SEC. 305. The Secretary is authorized to enter into amendatory repayment contracts with the Stanficlci and Westland Irrigation Districts, or other water user-s, if appropriate, to secure the return of reimbursable irrigation construction and operation and maintenance costs arising from the modification and reallocation of McKay Dam and Reservoir. SEC. 306, There is hereby authorized to be appropriated for modification of McKay Dam the sum of $1,300,000 (based on July 1975 prices), plus or minus such amounts, if any, as may be justified by reason of changes in construction costs as indicated by engineering cost indexes applicable to the types of construction involved, and, in addition thereto sums as may be required for operation and maintenance of McKay Dam and Reservoir.

BQ-1Qil n _ 7 B

n* 1

17

43 USC 616ww.

43 USC 616ww-l.

43 USC 616WW-2.

43 USC 616ww-3.

43 USC 616ww-4,

Appropriation authorization.

43 USC 616ww-5,