Page:United States Statutes at Large Volume 91.djvu/526

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

PUBLIC LAW 95-000—MMMM. DD, 1977

91 STAT. 492

Offsite area protection.

Spoil disposal.

Slide or erosion barriers.

PUBLIC LAW 95-87—AUG. 3, 1977 period of responsibility for revegetation shall commence at the date of initial planting for such long-term intensive agricultural postmining land use: Provided further, That when the regulatoryauthority issues a written finding approving a long-term, intensive, agricultural postmining land use as part of the mining and reclamation plan, the authority may grant exception to the provisions of paragraph (19) above; (21) protect offsite areas from slides or damage occurring during the surface coal mining and reclamation operations, and not deposit spoil material or locate any part of the operations or waste accumulations outside the permit area; (22) place all excess spoil material resulting from coal surface mining and reclamation activities in such a manner that— (A) spoil is transported and placed in a controlled manner in position for concurrent compaction and in such a way to assure mass stability and to prevent mass movement; (B) the areas of disposal are within the bonded permit areas and all organic matter shall be removed immediately prior to spoil placement; (C) appropriate surface and internal drainage systems and diversion ditches are used so as to prevent spoil erosion and movement; (D) the disposal area does not contain springs, natural water courses or wet weather seeps unless lateral drains are constructed from the wet areas to the main underdrains in such a manner that filtration of the water into the spoil pile will be prevented; (E) if placed on a slope, the spoil is placed upon the most moderate slope among those upon which, in the judgment of the regulatory authority, the spoil could be placed in compliance with all the requirements of this Act, and shall be placed, where possible, upon, or above, a natural terrace, bench, or berm, if such placement provides additional stability and prevents mass movement; (F) where the toe of the spoil rests on a downslope, a rock toe buttress, of sufficient size to prevent mass movement, is constructed; (G) the final configuration is compatible with the natural drainage pattern and surroundings and suitable for intended uses; (H) design of the spoil disposal area is certified by a qualified registered professional engineer in conformance with professional standards; and (I) all other provisions of this Act are met. (23) meet such other criteria as are necessary to achieve reclamation in accordance with the purposes of this Act, taking into consideration the physical, climatological, and other characteristics of the site; and (24) to the extent possible using the best technology currently available, minimize disturbances and adverse impacts of the operation on fish, wildlife, and related environmental values, and achieve enhancement of such resources where practicable; (25) provide for an undisturbed natural barrier beginning at the elevation of the lowest coal seam to be mined and extending from the outslope for such distance as the regulatory authority shall determine shall be retained in place as a barrier to slides and erosion.