Page:Historic highways of America (Volume 14).djvu/113

From Wikisource
Jump to navigation Jump to search
This page has been validated.
PLANNING, BUILDING, AND OPENING
109

Great Tonawanda Swamp, was $450,000, and for the total distance to the Genesee River, $780,000. The absence of water on this route made reservoirs necessary, which formed a strong objection to pursuing that course. Anticipating this, Engineer James Geddes was sent over another course from a point twelve miles up the Tonawanda to the Seneca River. The distance was one hundred and thirty-six miles; the rise of one hundred and ninety-four feet from Seneca River to Lake Erie was to be overcome by twenty-five locks; the total expense was put at $1,550,985. The Middle Section extended from Seneca River to Rome, with a decline of forty-eight and one-half feet in seventy-seven miles. It was surveyed and laid out by Benjamin Wright; the estimate included $1,500 per mile for grubbing, so heavy were the forests, and reached a total of $853,186, which was considered liberal. The Eastern Section from Rome to Albany was surveyed in part by Engineer Charles C. Broadhead. The seventy odd miles to Schoharie Creek, with a descent of 132.85 feet, called for sixteen locks and forty-five