10
c. xix
South Yorkshire Light Rail Transit Act 1989

The paged version of this document contained the following header content in the margin: Part IVcont

Provided that if the cost of maintaining, working or renewing railway property is reduced in consequence of any such alterations or additions, a capitalised sum representing such saving shall be set off against any sum payable by the Executive to the railways board under this section:

(13) If the cost to the railways board of altering any existing railway within its boundaries or of maintaining or reconstructing any existing railway under any powers existing at the passing of this Act is increased by reason of the existence of the specified works any such additional expense which the railways board, after giving 56 days notice to the Executive, reasonably so incur shall be repayable by the Executive to the railways board:

(14) The Executive shall repay to the railways board all costs, charges and expenses reasonably incurred by the railways board—

(a) in constructing any part of the specified works on behalf of the Executive as provided by paragraph (5) above, or in constructing any protective works under the provisions of paragraph (6) above, including, in respect of any permanent protective works, a capitalised sum representing the reasonable cost of maintaining and renewing those works;

(b) in respect of the employment of any inspectors, signalmen, watchmen and other persons whom it shall be reasonably necessary to appoint for inspecting, watching, lighting and signalling railways and for preventing interference, obstruction, danger or accident arising from the construction, maintenance, repair or failure of the specified works;

(c)in respect of any special traffic working resulting from any speed restrictions which may, in the opinion of the engineer, be necessary by reason of the construction, maintenance, repair or failure of the specified works or from the substitution, suspension or diversion of services which may be necessary for that reason;

(d) in respect of any additional temporary lighting of railways in the vicinity of the specified works, being lighting made reasonably necessary by reason of the specified works or the failure thereof;

(e) in respect of the approval by the engineer of plans supplied by the Executive under paragraph (4) above and the supervision by him of the construction of the specified works:

(15) If at any time after the completion of the specified works, not being works vested in the railways board, the railways board give notice to the Executive that the state of repair of the specified works appears to affect prejudicially any operational railway of the railways board, the Executive shall, on receipt of such notice, take such steps as may be reasonably necessary to remedy any such defect:

(16) All temporary structures, erections, works, apparatus and appliances erected or placed by the Executive under the powers of this Act upon, over or under any operational railway of the railways board shall, as soon as reasonably practicable, be removed by the Executive at times to be agreed with, and to the reasonable satisfaction of, the engineer and in such a way as to cause as little damage to the railway and as little interference with, or delay or interruption to, the traffic on the railways of the railways board as may be; and if any damage to railway property or such interference, delay or interruption shall be caused by any such failure to remove any such temporary structures, erections, works, apparatus or appliances, the Executive shall make