This page needs to be proofread.
Contents
- Acronyms
- Introduction
- Mir Principal Expedition 17
- Mir Principal Expedition 18
- Mir Principal Expedition 19
- Mir Principal Expedition 20 and Euromir 95
- Mir Principal Expedition 21
- Appendix: Comparative Chronology of U.S./Russian Human Space Missions
- References
- Index
Boxes
- STS-63 Mission Highlights
- Spektr
- Orbiter Docking System
- STS-71 Mission Highlights
- STS-74 Mission Highlights
- Docking Module
- STS-76 Mission Highlights
- Priroda
Figures
- 1 Key to
- 2 The Mir complex at the end of 1994
- 3 The Mir space station, photographed from Discovery
- 4a Spektr in July, 1995 [drawing]
- 4b Spektr after installation [photo]
- 5 Mir space station configuration on May 26, 1995
- 6 Orbiter Docking System mounted in the payload bay of Atlantis
- 7 First docking of Atlantis with the Mir complex, June 29, 1995
- 8 The Mir complex as configured on June 2, 1995
- 9a The Russian-designed Docking Module [drawing]
- 9b The Docking Module in Atlantis' payload bay [photo]
- 10 Mir with new Docking Module installed on Kristall
- 11 The Priroda module
- 12 The Mir complex on May 7, 1996, with all base block ports occupied