Page:The Granite Monthly Volume 9.djvu/357

From Wikisource
Jump to navigation Jump to search
There was a problem when proofreading this page.
Lowell.
329

was ordained November 2, 1865, and resigned June 30, 1870; the Reverend Norman C. Mallory was settled September 14, 1870, and resigned June 30, 1874; the Reverend Orson E. Mallory was settled March 24, 1875, resigned February 28, 1878; the Reverend Thomas M. Colwell was settled May 4, 1878.

The First Congregational Church was organized June 6, 1826. The church edifice was built, in 1827, on land given by the Locks and Canals Company. The Reverend George C. Beckwith, the first pastor, was ordained July 18, 1827, and dismissed March 18, 1829. The Reverend Amos Blanchard, d.d., was ordained December 5, 1829, and dismissed May 21, 1845, when he became pastor of the Kirk-street Church. The Reverend Willard Child was installed pastor, October 1, 1845, and dismissed

NORTHERN RAILROAD STATION.

January 31, 1855. The Reverend J. L. Jenkins was ordained October, 17, 1855, and dismissed in April, 1862. The Reverend George N. Webber was installed in October, 1862, and dismissed April 1, 1867. The Reverend Horace James was installed October 31, 1867, and dismissed

Block corner of central and middle streets, 1848

December 13, 1870. The Reverend Smith Baker was installed September 13, 1871.

The Hurd-street Methodist Episcopal Church dates from 1826; the church edifice was built in 1839. The Reverend Benjamin Griffin was pastor in 1826; the Reverend A. D. Merrill, in 1827; the Reverend B. F. Lambert, in 1828; the Reverend A. D. Sargent, in 1829; the Reverend E. K. Avery, in 1830 and 1831; the Reverend George Pickering, in 1832; the Rev. A. D. Merrill, in 1833 and 1834; the Reverend Ira M. Bidwell, in 1835; the Reverend Orange