Page:UK Traffic Signs Manual - Chapter 8 - Part 2- Traffic Safety Measures and Signs for Road Works and Temporary Situations) - Operations 2009.pdf/122

From Wikisource
Jump to navigation Jump to search
There was a problem when proofreading this page.
MOBILE LANE CLOSURE TECHNIQUE

'TRAFFIC COUNT FORM FOR MOBILE LANE CLOSURES

DATE:
LOCATION:
OPERATION:
CONTRACTOR:
CLIENT SUPERVISOR:
WEATHER:
TIME CLOSURE ON:
CLOSURE OPERATIVES:
SUPERVISOR:
BLOCK VEHICLES:
200 YARDS VEHICLE:
500 YARDS VEHICLE:
800 YARDS VEHICLE:
OTHER (STATE):
TIME CLOSURE OFF:

Traffic flow limits applicable during the Mobile Lane Closure operation.

Traffic flow level above which the closure cannot be put into effect. Maximum allowable traffic flow level (see Table 10.1)
   


TRAFFIC COUNT

Time of
count
Marker
post
Vehicles per 3 minutes In limit?
Yes/No
Remarks, incidents and stops
Cars HGVs Total
             
             
             
             
             
             
             
             
             
             
             

Figure 10.2 Traffic count form for MLC operations

NOTE: This form may be photocopied for operational use.


120