Page:United States Statutes at Large Volume 102 Part 4.djvu/1046

From Wikisource
Jump to navigation Jump to search
This page needs to be proofread.

PUBLIC LAW 100-000—MMMM. DD, 1988

102 STAT. 4016

PUBLIC LAW 100-676—NOV. 17, 1988

sibility report for such project shall mclude consideration and evaluation of the following proposed project features: Long Beach Main Channel, Channel to Los Angeles Pier 300, Channels to Loa Angeles Pier 400, Long Beach Pier "K" Channel, and Los Angeles Crude Transshipment Terminal Channel. (e) Los ANGELES RIVER, CAUFORNIA.—The Secretary is directed to perform maintenance dredging of the existing Federal project at the mouth of the Los Angeles River, California, to the authorized depth of 20 feet for the purpose of maintaining the flood control basin and navigation safety. if) SUNSET HARBOR, CALIFORNIA.—The demonstration project at Sunset Harbor, California, authorized by section 1119(b) of the Water Resources Development Act of 1986 (100 Stat. 4238), is modified to include wetland restoration as a purpose of such demonstration project. All costs allocated to such wetland restoration shall be paid by non-Federal interests in accordance with section 916 of such Act. (g) INDIANA SHORELINE EROSION, INDIANA.—The undesignated paragraph of section 501(a) of the Water Resources Development Act of 1986 under the heading "INDIANA SHORELINE, INDIANA" (100 Stat.

4135) is amended by striking out "with an estimated first Federal cost of $15,000,000 and an estimated first non-Federal cost of $5,000,000." and inserting in lieu thereof "with the Federal share of the cost of this project to be determined in accordance with title I of this Act.". Slffei^SJ* fishing. (h) STUMPY LAKE, LOUISIANA.—The project for mitigation of fish WUdlife. and wildlife losses Red River Waterway, Louisiana, authorized by section 601(a) of the Water Resources Development Act of 1986 (100 Stat. 4142), is modified to authorize the Secretary to obtain, on a priority basis, up to 300 acres in the area of Stumpy Lake as part of such project. Such modification shall not increase the total authorization for land acquisition for such project. (i) ANNAPOUS HARBOR, MARYLAND.—The project for navigation, Annapolis Harbor, Maryland, is modified to authorize and direct the Secretary to realign by nonstructural, nondredging measures the channel in such project, as determined necessary by the Secretary, for the purpose of promoting more efficient mooring operations in Annapolis Harbor, (j) DEAL ISLAND, MARYLAND.—The Secretary may pay the remaining cost for the navigation project for Deal Island, Maryland (Lower Thorofare), authorised under section 107 of the River and Harbor Act of 1960, estimated at $277,000, plus any interest due the construction contractor. (k) REDWOOD RIVER, MARSHALL, MINNESOTA.—The project for fiood control. Redwood River, Marshall, Minnesota, authorized by section 401(a) of the Water Resources Development Act of 1986 (100 Stat. 4117), is modified to authorize the Secretary to construct the project substantially in accordance with the (general Design Memorandum, dated April 1987, at a total cost of $6,900,000, with an estimated first Federal cost of $5,000,000 and an estimated first non-Federal cost of $1,900,000. (1) ROOT RIVER BASIN, MINNESOTA.—The undesignated paragraph of section 401(a) of the Water Resources Development Act of 1986 under the heading "ROOT RIVER BASIN, MINNESOTA (100 Stat. 4117) is amended by adding at the end thereof the following new sentence: "Nothing in this paragraph precludes the Secretary from carrying